The fire shelter is required personal protective equipment (PPE) for all federal wildland firefighters and must be carried on the fireline by everyone on federal wildfires. All National Wildfire Coordinating Group (NWCG) member agencies have required carrying a fire shelter since 2010. State, local, and rural fire departments may have different policies regarding the fire shelter’s use.

The fire shelter was first required for federal wildland firefighters in 1977. Since then, shelters have saved hundreds of firefighters’ lives and protected hundreds more from serious injuries. However, it is important to understand that the shelter will not protect firefighters in all deployment situations. Sadly, between the old style and M-2002, 41 firefighters have perished in fully or partially deployed shelters.

Carrying a fire shelter should never be considered a risk mitigation tool or substitute for safety.

What you see on this site may be familiar because much of the guidance for using shelters is unchanged. Stories relayed by firefighters who survived deployments can help other firefighters learn how to use the M-2002 shelter. For interviews with deployment survivors, see the Resources tab on the menu.

This site is a reference for fire shelters and is not intended to stand alone. New and experienced firefighters should use this site as part of a comprehensive fire shelter training program that includes facilitated discussions and hands-on training. No one who is required to carry a fire shelter should go on the fireline without reading, understanding, and practicing the recommendations provided on this site.

This site contains 10 sections, each explaining a different part of the fire shelter, training for its use, and the use of the fire shelter on the fireline. For training purposes, sections can be utilized individually, or in conjunction with others. The shelter training sections are:

  • Fire Shelter History – Provides the history of the fire shelter, and material, and design advancements.
  • Know Your Fire Shelter – Explains how the fire shelter protects you.
  • Escape and Entrapment – Provides information on avoiding entrapments and reviews entrapment situations.
  • Selecting Your Deployment Site – Discusses deployment site selection.
  • Deployment – Explains how to prepare for deployment and the steps to deploy your shelter.
  • During a Deployment – Provides information on what can be expected during a deployment.
  • Training – Explains the importance of training and provides training scenario suggestions.
  • Inspection and Care – Describes inspection criteria and procedures that will keep worn shelters off the fireline.
  • After a Deployment – Discusses what may happen in the days and weeks following a deployment.
  • Resources – Provides project review information, training aids, Tech Tips, publications, reports, and Fire Shelter Deployment Stories.
 

 

 

 

Modified / Reviewed:

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page