Net – Cargo, 12’ X 12’, Polypropylene, 3000 lbs. Capacity

NFES #
000531
Category
Aviation
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria  

  1. Inspect for fraying or deterioration of lines. Ultra violet exposure is the most important factor in the degradation of the strength of the cargo nets constructed from polypropylene rope, not use or age. There is no visual or other field inspection technique that will guarantee that a cargo net is free from degradation due to ultraviolet exposure. However, if the net is free of brittleness, has no more than 10 percent broken strands in any two adjacent cycles, and there is no chalking or other visible damage, then the net is probably safe for further use.
    • Inspect for more than 10 percent of strands in any two adjacent cycles of the net being broken.
    • Inspect for brittleness by bending several areas of the nets rope 180° back on itself. If more than 2 strands break per bend, dispose of net or return to manufacturer for repair.
    • Inspect for chalking by running a lightly grasped hand over several of the ropes in the net. If small, white, chalk-like fragments of the rope come off in your hand then chalking has occurred. If chalking is present, it is likely that the net has received enough ultraviolet exposure to cause embrittlement and the net must be further inspected for broken strands.
  2. Inspect all ropes for fraying, burns, or wear points.
  3. Inspect netting for contamination by fuel oils or other liquids considered degenerative to netting.
  4. Verify an identification tag is attached to every net. If a tag is not attached, attach one but only if the chain of custody can be verified. There are many companies that make similar looking nets that are not of the same capacity. If the chain of custody cannot be verified, the net must be taken to a net manufacturer and proof tested to twice its Work Load (e.g. tested to 6,000 lbs. for a 3,000 lb. net. (Note: It has been found that the cost to perform this test for a net missing its tag is about ¾ the cost of new net. The custodian of the net should consider the economics before sending the net out for proof testing.)
    • Replacement tag info should include NFES #, Working Load Limit (WLL) in pounds, i.e., 3,000 lbs. /6,000 lbs., cache identifier and date.
    • Inspect loop thimbles for cracks, wear, and deformation. Ensure thimbles are not loose from net and easily removed.
    • On some heavy cargo nets (NFES #000458), the mesh intersections are fixed with molded plastic crosses. These should be visually inspected for cracks and missing parts. Remove from service if broken or missing components are identified.
    • Any NFES #000795 net that is constructed of black mesh must be taken out of service.
    • Return to stock if items pass inspection, are clean, and in unused condition.
    • Refurbish if deemed necessary through inspection and repairs economically feasible.
    • Dispose of item if refurbishment or repair will not correct deficiencies identified during the inspection process.

Refurbishing Procedures

A. Cleaning

  1. Clean all dirt from netting.
  2. Remove all flagging, string, and rope.
  3. Hang or stack polypropylene nets and clean with water from high-pressure hose.
  4. Dry completely before packaging.

B. Repairs

Any repairs should be completed by net manufacturers. 76 NFES #000531 NFES #000458

C. Testing for Performance

none

D. Repackaging

Suggested cartons are: 

  • NFES #000531, package 1 each in NFES #002006 carton (23” X 19” X 10”).
  • NFES #000458, package 1 each in NFES #002007 carton (24” X 16” X 16”).
  • NFES #000795, package 1 each in NFES #008064 carton (10” X 8” X 6”).

 

NWCG Latest Announcements

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids