Skip to main content

Tank – Gasoline, 5 GL (18.9L), Pump Adapted

NFES #
000218
Category
Fuel Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Check for fuel in tank.  Evacuate tank if fuel is present.
  2. Inspect threads on connector for serviceability.  Inspect for missing or cracked and damaged gasket on cap.  Inspect all interior surfaces for rust that has pitted, is flaking or is lifting the interior surface.  Rust spots larger than a quarter or collectively multiple areas larger than a quarter will render the can unserviceable.  Some “flash rust” maybe present and is acceptable.  Using a mirror and flashlight, inspect the ceiling of the can for additional rust.
  3. Inspect for impacts or dents to corners and seams as separation and/or leaks may occur.
  4. Inspect and tighten quick release fuel valve. 
  5. Return to stock if clean and in unused condition.
  6. Refurbish item if tank is free of damage or rust.
  7. Dispose of item if tank damage is significant, leaks are detected or rust is found inside of tank.

Refurbishing Procedures

A. Cleaning

  1. Drain existing fuel and purge. Dispose of fuel according to hazardous material regulations and local policies.
  2. Use an air hose to dry the interior of the tank and remove debris inside the female opening of the quick disconnect coupling.
  3. Turn upside down with lids off to dry.
  4. Clean vent hole to ensure serviceability.
  5. Wipe down outside of container and repaint if necessary.

B. Repair

  1. Replace missing, cracked or stiff gaskets.
  2. Ensure fuel geyser warning label is present and legible. Reference cache memo 17-2 Fuel Geysering Awareness Sticker and Labels.
  3. Flammable liquid labels are not required for this fuel tank. Refer to NWCG Standards for Transporting Fuel, PMS 442.

C. Testing for performance

  1. Check all threads on connector for serviceability.

D. Repackaging

  1. Local cache option
  2. Recommended when shipping, pack in carton NFES #008052 (16”x14”x10”)

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page