Skip to main content

PMS 448

Tool – Combination Shovel and Grub Hoe

NFES #
001180
Category
Tools
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for structural damage to pick, hoe blade or both that cannot be repaired or serviced by replacing components.
    1. Inspect pick for the following:
      • If bent or twisted.
      • If shorter than 4½” long in extended position.
      • If cracks or enlarging exist around hinge leg bolt hole.
    2. Inspect hoe blade for the following: 
      • Cracks or looseness in the area of the hinge leg rivets.
      • If hinge leg bolt hole is enlarged or cracked.
      • If shorter than 6” (measure from turn step to blade tip).
    3. Inspect handle for the following:
      • Cracked, bent, twisted, or has open grain.
      • Has been shortened (except for detachable handle smokejumper version, which has a 4” shorter handle).
      • Has a nonstandard handle.
  2. Return to stock if item passes initial inspection, is clean, sharp and in unused condition.
  3. Refurbish if damage is repairable or replaceable, or if handle reconditioning or tool sharpening are required.
  4.  Dispose of tool if it fails initial inspection or has been modified such that it cannot be return to like new condition.

Refurbishing Procedures

A. Cleaning

  1. If friction nut does not turn freely, flush with water. Blow clean with air gun. (Wear safety glasses). If the nut does not turn freely after flushing, remove the hinge leg bolt and friction nut and clean the threads inside.  Do not use oil on the friction nut threads or hinge bolt, since oil attracts dust and debris.
  2. If tool head cannot be tightened, inspect hinge leg surface contact with friction nut. Remove hinge leg bolt; grind hinge legs as needed so they meet flush with friction nut.
  3. Clean handle to remove dirt, tree sap, or other foreign debris.
  4. Wash tool head with water and mild detergent.  Dry completely before storage.

B. Repair

  1. Sharpen both blade and pick at 45 degree angle per hand tool.  Refer to tool sharpening gauge NFES #000510.
  2. Tighten handle in ferrule by peening rivet head.
  3. Sand handle if it is chipped, dinged, rough or has tape residue. 
  4. Wipe handle with linseed oil after sanding.
  5. Apply rust inhibitor to tool head.  Local cache option for painting tool head.  Black paint only.
  6. Handle replacement:
    1. Grind off end of rivet. 
    2. Punch it through the handle.  Remove the handle from the ferrule.
    3. Place the new handle in the ferrule and drill hole through handle.
    4. Replace the rivet with #6 x 1-13/16 inch long rivet.  Tap rivet with a hammer to mushroom the rivet head or until the handle is tightened.  Replacement handles are available from DLA (NSN 5120-01-296-3592).

C. Testing for Performance

  1. Extend hoe blade and pick at right angles to tool handle.
  2. Tighten friction nut (wear gloves). Move blade and pick up and down and further tighten friction nut.
  3. Repeat process to ensure that the blade and pick can be maintained tight by the friction nut.

D. Repackaging

  • 10 each in NFES #000384 carton (46” x 11” x 8”).   

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page