Skip to main content

Nozzle – Twin Tip, Combination, 1” NPSH-F

NFES #
000024
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for obvious damage, cracks, and large burrs.
  2. Inspect for gasket and screen.
  3. Inspect handle for damaged or missing screw. Ensure handle is in the correct position and turns freely into the proper positions.
  4. Inspect for fire damage. Fire damage may cause failure in the future.
  5. Inspect hose coupling threads for damage.
  6. Return to stock if nozzle is clean and shows no sign of damage or use.
  7. Refurbish if damage is repairable or if missing components are replaceable.
  8. Dispose of item if damage is excessive, or if nozzle fails Testing for Performance and deficiencies are not correctable.

Refurbishing Procedure

A. Testing for Performance

  1. Install nozzle on pump.
  2. Open handle on nozzle.
  3. Turn on water.
  4. Inspect and operate straight stream tip and fog tip ensuring neither is clogged. Clear obstructions if present.
  5. Close handle.
  6. Pressurize nozzle to 300 PSI. Test at pressure for 3 minutes.
  7. Inspect for leaks:
  • Gasket
  • Under the handle
  • At both tips

B. Cleaning

  1. Clean in a dish washing detergent with brush, scouring pad or high-pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly, stand upright with handle in open position and allow to air dry.

C. Repair

  1. Replace handle and ball with a new kit if needed.
  2. Replace tail gasket and/or screen if missing, cracked, or stiff. Nozzle will have a 3/16” straight-stream tip (NFES #000637) and a 2-4 gal/min fog tip (NFES #000635).
  3. Apply silicone based 0-ring lubricant to O-rings if needed.

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  1. Stand upright and dry completely prior to repackaging.
  2. Jute twine through valve and lower nozzle.
  3. Package in units containing nozzle body with a 3/16” straight-stream tip, NFES #000637 and 2-4 gal/min fog tip, NFES #000635.
  4. Package 20 each in NFES #008010 carton (16 3/8” x 13 5/8” x 7” w/ insert).

 

NWCG Latest Announcements

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids