Skip to main content

Hose – Cotton Synthetic Jacket, 1 1/2” NH X 3’, Rubber Lined

NFES #
000114
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Return to stock if hose is banded and in unused condition.
  2. Visually inspect for burns, cuts, damaged fittings.
  3. Inspect gasket for cracks, if any replace.
  4. Refurbish if item passes initial inspection.
  5. Dispose of hose if it fails initial inspection or fails Testing for Performance. Good couplings should be salvaged from hose that is not repairable.
  6. Recycle brass fittings from disposed hose.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect female end of hose to pump or manifold:
    1. Confirm connection ends are not out of round and there is no damage to threads.
    2. All 1½” hose should be NH threads. 
  3. Pressure Test:
    1. Start pump.
    2. Make sure nozzles are open. Let all air escape from hose. Shut nozzles.
    3. Pressurize hose to 300 PSI and hold for 3 minutes.
    4. Inspect hose for the following which indicate a need for repair or disposal:  burns, cuts, or leaks between hose and couplings, at swivel portion of female coupling, and along the length of the hose.
  4. Female and male couplings:
    1. Inspect for leaks where hose goes into coupling.
    2. Inspect for crooked coupling (easier to see when hose is charged).
  5. Shut down pump and relieve water pressure from system.
  6. Remove hose.
  7. Stretch out good hose to drain.

B. Cleaning

  1. Clean excess dirt from hose.
  2. Run hose through hose washer using clean water or clean water with a mild detergent or clean with high pressure wash.
  3. If detergent is used, rinse with clean water.
  4. Allow hose to drain and dry completely before rolling.

C. Repair

  1. Repaired hose shall result in lengths that are a minimum of 90 percent of original length.
  2. Good couplings shall be salvaged from disposed hose.
  3. Re-coupling procedures.
    1. Remove old expansion ring and coupling from hose.
    2. Remove unserviceable portion of hose, squaring end to be re-coupled.
    3. Utilize expander machine to insert new expander and coupling. Follow specific machine operating instructions.
    4. Following re-coupling, hose that has been repaired or recoupled should be retested at a test pressure of at least 50 percent greater than the service test pressure following Testing for Performance above.

D. Repackaging

  1. Roll in a single roll configuration with male coupling in center of roll.
  2. Secure roll (plastic band, string).
  3. Local cache option for storage.
  4. Roll, secure, and place on pallet.

 

NWCG Latest Announcements

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids