Skip to main content

Nozzle – Plastic, 60 GPM, 1 1/2” NH-F X 4 3/4” Long

NFES #
000137
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for burrs and cracks, broken plastic, or fire damage.  Inspect gasket and replace if missing, cracked, or stiff. Inspect for screw and nylon washer. Inspect hose coupling threads for damage.
  2. Barrel must turn freely.
  3. Return to stock if nozzle functions properly, is free of damage and clean.
  4. Refurbish if nozzle is repairable.
  5. Dispose of any nozzle that is damaged beyond repair, has burn damage, or fails Testing for Performance and deficiencies cannot be corrected. Old style KK: Inspect threads inside of barrel; if they are damaged, dispose of nozzle.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect nozzles to pump or manifold. Confirm connection ends are not out of round and there is no damage to threads.
    1. Pressure Test:
      1. Start pump.
      2. Make sure nozzles are open. Let all air escape. Shut nozzles.
      3. Pressurize to 300 PSI and hold for 3 minutes.
  3. Inspect for leak:
    • Around the gasket
    • Behind the barrel
    • The tip of the barrel
      ​Note: Due to manufacturing processes a water tight shut-off seal on NFES #000137 and #000138 is very difficult to attain. Minimal drips or slight mist spray from the tip are acceptable for RFI condition.

B. Cleaning

  1. All items will be washed and cleaned of foreign matter, such as mud, dirt, and grease. Clean in a mild detergent with brush and scouring pad, or high pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly.
  3. Stand upright with barrel in open position to drain water and dry.
  4. Lubricate threads on back of the barrel with appropriate dry lubricant (graphite).

C. Repair

  1. Replace gaskets, washers or screws as needed.
  2. If plastic nozzle is found defective, dispose (NFES #000137, #000138).

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  • Stand upright and dry completely prior to repackaging.
    • Use NFES #008064 carton (10” x 8” x 6”) 
    • Use NFES #008018 carton (12” x 12” x 6”) PACK 10 PER CARTON
    • Use NFES #008017 carton (18” x 12” x 10”)  PACK 60 PER CARTON

 

NWCG Latest Announcements

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids