Skip to main content

Tank – Dip, 15,000 GL (Heliwell)

NFES #
000669
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Observe condition prior to take down or after setting up unit following manufacturer’s assembly procedures.
    • Look at rim covers and inspect attached webbing.
    • Remove rim covers and inspect top of tank for abrasions or tears.
    • Look in tank for slices or holes and mark with felt pen if repairs needed.
    • Inspect panels to ensure they are not bent or misshapen and attached clips are functional.
    • Inspect turn buckles and cables for frays and burrs.
  2. Return to stock if unused.
  3. Refurbish item, if repairs are extensive, refer to SEI Industries website.
  4. Dispose of irreparable components and replace as necessary.

Refurbishing Procedures

A. Cleaning

  1. Clean tank liner and panels, inside and outside with soapy water and a brush or highpressure wash and rinse.
  2. Rinse well with clean water from high-pressure washer.
  3. Allow to air dry on both sides.

B. Repair

  1. Weld all cracked or broken welds on aluminum panels.
  2. Patch any damaged areas marked in liner. All patches should be welded with patch material that is recommended by the manufacturer.
  3. Rivet rim covers if missing.
  4. Straighten panels and replace clips if needed.
  5. File off burrs on turn buckles.
  6. Replace any missing or damaged fittings, valves, adapters or caps.

C. Testing for performance

  • Verify panels are close together by inspecting placement.

D. Repackaging

  1. Fold tank liner into a shape that fits underneath one panel. See Heliwell operator’s manual on SEI website.
  2. Place folded liner on a pallet and stack panel atop tank.
  3. Box other components together and place on pallet.
  4. Strap down tank, panels, and boxed components securely.

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page