Skip to main content

Tank – Snap, 1500 GL

NFES #
007700
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for all parts and components to form a complete tank; 8 vertical legs, 16 snap support bars, 1 liner, 1 carrying bag and one 3” plug. Inspect for broken or bent legs and support bars. Inspect liner and carrying case for rips, tears, or punctures. Check threads on plug and flange assembly for damage.
  2. Return to stock if all components are accounted for and tank is clean and in unused condition.
  3. Refurbish if damaged or dirty components are repairable and, can be replaced or cleaned. Refurbish liner if economically feasible. Contact manufacturer for repairs requiring materials or skills not found at the local cache to determine if it is economically feasible to have manufacturer repair tank.
  4. Dispose of damaged components or complete tank if damage is excessive.

Refurbishing Procedures

A. Cleaning

  1. Dismantle and wipe all metal parts with a damp cloth.
  2. Power wash liner and clean bag with mild soap, using a stiff brush if necessary.

B. Repair

  1. Replace missing or broken parts of frame.
  2. File all burrs smooth on metal components.
  3. Suspend tank and mark any holes or damage needing repair.
  4. Patch all marked damaged areas. Patch any hole or tears. Small pin hole can be repaired with manufacturer recommended TEAR-AID® Type B or other similar material recommended by the tank manufacturer. Larger holes should be patched with material recommended by the manufacturer utilizing a vinyl welding process. For extremely large holes, contact the tank manufacturer for recommended repair or replacement options.
  5. Replace all damaged hose couplings and drain plugs.
  6. Stencil correct NFES # of item on collar of tank if missing or unreadable.
  7. Ensure all locking buttons snap into place and lubricate as necessary.

C. Testing for performance

  • None

D. Repackaging

  • Local cache option.

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page