Skip to main content

RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR)

RT-130 Decorative banner. Group of photos depicting wildland firefighters performing various duties.

1994 South Canyon Fire on Storm King Mountain

This module looks at the South Canyon Fire where 14 perished, and discusses safety, hazards, risk, and entrapment avoidance.
Category: Case Studies
Core Component(s):
Incident Reviews and Lessons Learned, Fire and Aviation Operational Safety, Human Factors, Communication and Decision Making, Fire Shelters and Entrapment Avoidance
Estimated Delivery Time: 2 hour
Video Length: Part 1: 39:50; Part 2: 41:52

Part 1

Part 2

 

Intent

Review the sequence of events that led to tragedy on the South Canyon Fire and discuss significant lessons learned.

Facilitator Preparation

  • Review the two videos and module tools.
  • Consider additional activities and discussion questions pertinent to the location and agency.

Facilitating the Discussion

  • Show the two videos.
  • Facilitate a small or large group discussion using the activity and discussion questions below.
  • Guide discussion based on the Downhill Checklist in the Incident Response Pocket Guide (IRPG), PMS 461. Provide copies of the IRPG for students to utilize and answer questions.

Discussion Questions

Part 1

  1. Which hazardous conditions for downhill fireline construction were present?
  2. What supervisory/overhead personnel and crew supervisors discussed the situation prior to committing crews to the assignment?
  3. What supervisory/overhead personnel stayed with the job?
  4. Was the fireline scouted?  When was the decision made to engage the fire?
  5. Was there direct contact between the crew(s) and a lookout(s) that could see the fire?
  6. Was there communication between all personnel from top to bottom?
  7. Was there rapid access to a pre-identified identified safety zone?
  8. Was direct attack being used?
  9. Was the fireline in or adjacent to a chute or chimney?
  10. Was the fireline anchored at the starting point on top?
  11. Was the bottom of the fire being monitored?
  12. What other tactical alternatives could have been used on this fire?

Part 2

  • Consider the casual factors identified in Part 1; then summarize the significant lessons to be learned from this case study.

Resources

Additional Video Information

  • These videos are also available as a download (Part 1) (zip file, size 8 GB)​ and  download (Part 2) (zip file, size 8 GB)​ with .srt files for closed captioning (you may need to right click and Save As). For information on how to add closed captioning to a video, see this how to page.
  • Note: For Chrome, Firefox, and Edge, right click the word download and select Save Link As; for Internet Explorer (IE), right click and select Save Target As.

Last Modified / Reviewed:

Please Provide Feedback

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.

NWCG Latest Announcements

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids