Skip to main content

Dozer/Plow Operations

Dozers and tractor plows provide suppression and support capability for fire operations. When working on or around dozers on the fireline, it is important to respect the following guidelines:

  • Load/unload equipment from the transport in a safe manner on a level, stable surface.
  • Park transport in an area free of vegetative fuel. Clear an area if needed to protect parked equipment.
  • Do not sit or bed down near equipment. Walk around the equipment before starting or moving it.
  • Lower the dozer blade and/or fire plow to the ground when the equipment is idling or stopped.
  • When working around a dozer or tractor plow, stay at least 100 feet in front or 50 feet behind the equipment.
  • Allow no one but the operator to ride on the equipment.
  • Never get on or off equipment while it is moving.
  • Provide front and rear lights for equipment working at night or in heavy smoke.
  • Provide lights and fluorescent vests to personnel working with dozer/tractor plow units.
  • Use hand signals for direction and safety.
  • Do not use a dozer or tractor plow without a canopy or brush guard and radio communications.
  • Operators will wear required personal protective equipment (PPE) and carry a fire shelter.
  • Be aware of different fuel types, rates of spread, and flammability.
  • Watch for wetlands, steep slopes, rocks, ditches, and other obstacles that might stop the equipment.
  • Do not get too far ahead of a firing crew during firing operations.
  • Anchor the line to a secure firebreak and create a black line (burn out) until the fire is completely enclosed.
  • Tractor plow operators should wear headgear protection for head, face, eyes, and ears while also providing radio reception and ventilation capabilities.
  • Tractor plow crews should consist of a minimum of two people.
  • When the dozer or tractor plow is equipped with a hand-clutch lever, always take equipment out of gear when mounting and dismounting.
Category

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

2025 Wildland Fire EMS Awards

Date:  June 12, 2026
Questions? 
Please contact: Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) announces the recipients of the 2025 Wildland Fire Emergency Medical Service (EMS) Awards. EMC annually recognizes individuals and groups who have demonstrated outstanding actions or accomplishments that are above and beyond the expectation of one’s normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety of the wildland fire community. These awards are well deserved.

References:

2025 Wildland Fire EMS Awards

Emergency Medical Committee

Incident Position Standards and the Next Generation Position Task Book Now Available for RAMP

Date:  June 12, 2026
Questions? 
Please contact: Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Ramp Manager (RAMP).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Ramp Manager Position Page

National Interagency Aviation Committee

Make an Impact: Serve the Wildland Fire Community as an IPTM SME!

Date:  June 11, 2026
Questions? 
Please contact: NWCG SME Specialist

Note: Positions with an * will last approximately 6 months.
Positions with ** will last 12 - 18 months.

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. IPTM aims to transition NWCG’s training and qualification system to a performance-based model by updating position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and training where needed.

NWCG is currently recruiting SMEs for the Fall 2026 positions listed below:

  • Equipment Manager (EQPM)*
  • Fixed Wing Parking Tender (FWPT)**
  • Mixmaster (MXMS)*
  • Public Information Officer Complex (PIOC)*
  • Retardant Crewmember (RTCM)*
  • Strike Team Leader Crew (STCR)*
  • Strike Team Leader Engine (STEN)*
  • Strike Team Leader Heavy Equipment (STEQ)*
  • Task Force Leader (TFLD)**
  • Wildland Fire Investigator (INVF)** 

Projects begin October 2026. Sign up by July 10, 2026, at the link below and review the attached document for additional details. 

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters

Date:  May 28, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) has issued Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters. Research from 2016 to 2025 shows that 88 cases of rhabdomyolysis (rhabdo) were reported. Analysis of reports from eSafety, the Safety Management Information System (SMIS), and the Wildland Fire Lessons Learned Center (LLC) indicates that rhabdo is common during this time of year due to Work Capacity Tests and contributing factors such as weather, hydration, nutrition, and medication or supplement use.

RMC issued this safety bulletin to raise awareness in the Wildland Fire Community, and to provide research findings and educational resources that support reducing future cases of rhabdo.

References:

NWCG Alerts

RMC Safety Bulletin 26-001: Rhabdomyolysis in Wildland Firefighters