Skip to main content

Hazard Tree – No Work Zones

 

No work zone (NWZ) graphic showing a large circle shaded with a NWZ clear circle on right side within shaded area indicating the potentially dangerous tree or high-value wildfire area.

Knowing the exact time a given hazard tree (or compromised section) will fail is extremely difficult, and is, in many cases, an unpredictable task. Given this fact, we need to manage firefighters’ exposure to these hazards by creating a safe work area or No Work Zone (NWZ). The size and extent of the NWZ must be determined by onsite conditions, such as terrain, stand structure, and fire impacts on the tree and adjoining trees.

When an identified hazardous tree or trees cannot be felled, then perform an assessment of which areas have too high a risk, and post a lookout to warn the personnel to stay clear of these areas while working in adjacent areas. If hazard still exists before leaving the area, flag the NWZ so that personnel entering the area will be able to recognize the hazard. Use the following failure zone illustrations as examples to help manage firefighter exposure to these identified hazards. Also, remember to include the possibility of the Domino Effect to surrounding trees.
 

Figure 1 - 1 1/2 X Height of snag   Figure 2 - 1 1/2 X Trunk-to-branch-tip distance     Figure 3 - 1 1/2 X Length of dead top   
Figure 1 - graphic showing the potential failure zone of a dangerous area around a snag tree.Figure 2 - graphic of a tree showing the distance of dead limb hazard area.Figure 3 - graphic showing a pine tree with potential failure zone of the dead top.

      

 

Category

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249

New Glossary Term for Review

Date:  April 15, 2026
Questions? 
Please contact: Data Standards and Terminology Board (DSTB)

The Data Standards and Terminology Board is requesting feedback on a new glossary term: Resource Protection Measure (RPM).

The proposed definition is: Practical guidance provided for incident personnel in a manner in which incident objectives can be achieved while reducing impacts to identified resources across the landscape. RPMs are informed by, but not restricted to, Minimum Impact Strategies and Tactics (MIST).

Please review, share with your subgroups, and provide feedback as appropriate through the following form: Request Feedback The comment period will close May 10, 2026.

Thank you for your engagement in the NWCG glossary process – your participation is key to our success.

References:

Glossary Request Feedback

Quarter Three Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  April 1, 2026
Questions? 
Please contact: Leadership Committee

NWCG is excited to announce that Quarter Three materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Three materials focus on Leadership Level 3: Leader of People (Develop Intent). Leadership Level 3 is where your values, your team, and your influence come together. Leaders of People put their teams first, build trust, and lead with authenticity. They mentor future leaders and shape decisions up and down the chain.

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Committee

WFSTAR 2026 Core Components Module Package and 2025 Fire Year in Review Now Available

Date:  March 23, 2026
Questions? 
Please contact: Joe Schindel

The 2026 Core Components Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2025 Fire Year in Review are now available on the NWCG website. The 2026 Core Components Module Package provides all content needed to deliver RT-130.

References:

2026 Core Components Module Package

2025 Fire Year in Review Module