Skip to main content

Building Fireline Downhill With Fire Below

 

Building fireline downhill requires special attention to safety factors because of the potential for rapid uphill fire spread. This Watch Out depicts firefighters building fireline downhill without first mitigating the existing hazards.

9. Building fireline downhill with fire below. Three firefighters use tools to dig fireline down a steep slope covered in grass and brush.  Large flames are below them as the fire burns uphill.

9. Building fireline downhill with fire below. 

Read about all 18 Watch Out Situations.
 

As a rule, construct line moving uphill: Many firefighters have lost their lives attacking wildland fires from above. If there is no practical alternative to constructing line downhill, proceed only after weighing the following considerations:

  • Has the area been scouted for fire perimeter and behavior? Discuss what you need to know about the fire perimeter and fire behavior before building fireline downhill with fire below.
  • Will the wind direction be at your back? Will it stay at your back? Talk about how winds can change when you are on a slope (e.g., time of day, upslope and downslope breezes, etc.).
  • Is the area free of chimneys and gullies? How would you negotiate your line location if there were chimneys and gullies below where you want to work?
  • Are there adequate safety zones and escape routes? How do you maintain adequate safety zones and escape routes as you progress downhill?
  • Can you complete the burnout downhill as you work, providing an anchor point and safety zones? Discuss how you decide to carry the burnout with you or wait until you have tied into a fireline down below.
  • Have lookouts been posted? What should they be monitoring?
  • Have you established good communications? What are some of the dangers of poor communication with lookouts and crews working towards you? Describe the benefits of maintaining good communications.
  • Can the line be completed and burned out before the fire reaches it? Discuss how this would affect where you locate the line.
  • Do you have adequate resources to complete the assignment? What additional resources might you need to safely take on an assignment that includes building fireline downhill with fire below? How many resources do you want to engage?
  • Is aerial support available if needed? What benefits can aerial resources provide? What might be an added danger from aerial resources in this type of situation (common denominators)?
  • Has everyone been briefed on the assignment, fire behavior, weather, communications, escape routes and safety zones, hazards, and tactics? Discuss who might provide this briefing, where they would receive their information, and where and when it might occur.

 

Last Modified / Reviewed:

Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee.


Follow NWCG on Twitter and Facebook

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page