Skip to main content

PMS 448

Kit – Shelter, 15’ X 27’

NFES #
000430
Category
Kits
Updated
Storage and Shelf Life Checks
None

This item has been deleted from the NFES catalog.

National Caches are not stocking or refurbishing this item.

Initial Inspection/Disposal Criteria

  1. Inspect packing list and instructions. Refer to NWCG National Fire Equipment System Catalog for a complete list of kit components.
    1. Assemble the mainframe and components according to instructions. All locking pins and flex joints should move easily.
    2. Inspect for burrs on all components of mainframe, eve bars, and base bars.
    3. Loosen flex joints and remove burrs as needed.
  2. Inspect and install door. Door should open and close easily.
  3. Inspect roof and wall panels for any tears or rips and repair as needed.
  4. Inspect windows and screens in wall panels. Repair or replace where necessary.
  5. Check for broken welds on key flange, repair by bolting.
  6. Return to stock if shelter was not used, all kit contents are accounted for, and the shelter is clean.
  7. Refurbish kit if the shelter was used or is missing components.
  8. Disposal of complete kits is not recommended. Seek direction from local cache management for specific disposal criteria. Components that are damaged beyond repair should be disposed of and replaced with like items.

Refurbishing Procedures

A. Cleaning

  1. Clean main frame and misc. parts with a damp cloth and mild detergent if necessary.
  2. Clean the roof and wall panels with a mild detergent and water solution. Use a brush to remove hard dirt and grime or high pressure wash. Rinse well.
  3. Air dry completely before repackaging.

B. Repair

  1. Repair or replace any part of the main frame as needed. Bolt key flange.
  2. When dismantling, wipe all component parts with a damp cloth and return to proper container.
  3. Repair any holes, tears or rips as needed.
  4. Ensure that all locking buttons snap into place.
  5. Ensure that the Velcro is dry on all panels before folding and placing in proper container.
  6. Stencil main frame with property number, stencil inside the center roof ring.
  7.  Ensure that all kit components are accounted for prior to repacking.

C. Testing for Performance

  • None

D. Repackaging

  1. Repack according to manufacturer’s instructions and local cache option.
  2. Ensure that installation/assembly instructions are included in package.

 

Reference

Replacement parts may be obtained by contacting:
Western Shelter Systems
830 Wilson Street
Eugene, OR 97402
Phone: 541–344–7267

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page