Skip to main content

PMS 448

Harness – Chest, Fire Shelter

NFES #
000294
Category
Miscellaneous
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for cuts, tears, frayed, or burned areas on webbing and harness material. Inspect for any area of abrasion that has weakened the webbing beyond repair. Inspect all plastic hardware for proper function, cracks, breaks, or missing components.
  2. Return to stock if item shown no sign of use or damage.
  3. Refurbish if holes, cuts, tears or burns are easily repaired, broken or missing components are replaceable, and if repairs are economically feasible.
  4. Dispose of item if excessive wear or damage is found and it is not economically feasible to return item to a like new condition.

Refurbishing Procedures

A. Cleaning - CLASS 2 CORDURA (MACHINE WASH OK)

  1. Allow any mud or loose dirt to dry, and remove using a stiff-bristle brush. If stains remain, wash as recommended below.
  2. Remove light oil and dirt stains by brushing with a solution of warm water and a mild detergent, rinse thoroughly, and hang to dry. “Mild detergents” includes most home laundry detergents that contain no chlorine bleach or added scents.
  3. For heavier oil or grease, soak in water-soluble biodegradable degreaser for at least 30 minutes, brush with a bristle brush, rinse thoroughly, and hang to dry.
  4. If machine washing, use only cold water on a gentle cycle and air dry.
  5. Where no other method is cleaning the fabric, wash with pressure washer set at wide fan, warm water, and only allow nozzle close enough as necessary for cleaning, the further away the better for the fabric. DO NOT MACHINE DRY. DO NOT USE BLEACH.

B. Repair

  1. Repair holes, cuts, tears, and/or burns; if economically feasible.
  2. Replace damaged hardware.

C. Testing for performance

  • Test hardware by fastening and unfastening. The hardware should function easily with little applied force and without difficulty in opening and closing.

D. Repackaging

  • Local cache option.

 

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514