Skip to main content

PMS 448

Berm – Containment, 55 GL (1 to 4 drums)

NFES #
000692
Category
Miscellaneous
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for dirt, debris, fuel, and other liquids which may be present and/or soiled absorbent cloth.  Dispose of soiled absorbent cloth according to local hazardous materials standards.
  2. Must have foam bumper around the outer edge (see photo below).  The lay flat style is being removed from service.
  3. Inspect for torn or missing tie down grommets, holes, rips, or tears that are large or too numerous. Repair if holes or tears are 1 inch or less, or a combination of 3 holes with a combined length of 1.5 inches.
  4. Return to stock if item shows no signs of use and passes initial inspection.
  5. Refurbish if damage detected is repairable.
  6. Dispose of item if damage is determined to be unrepairable.

Refurbishing Procedures

A. Cleaning

  1. Clean with pressure washer to remove matter such as mud, dirt, and grease.
  2. Use a solution of mild detergent and water to remove grease with an absorbent cloth.
  3. Dispose of saturated cloth according local hazardous materials standards.
  4. Wipe dry or let air dry.

B. Repair

  1. Hold up to strong light or sun to locate holes.  Holes or tears 1 inch or less or a combination of 3 holes with a combined length of 1.5 inches are acceptable for repair.
  2. With suitable cleaner, apply vinyl adhesive to both surfaces, i.e., patch and berm.
  3. Let dry till tacky.
  4. Place patch on damaged area and apply pressure with roller or suitable device for at least 1 minute.
  5. Let berm sit flat and dry.
  6. Vinyl welding with patch material like in thickness and color of berm material is acceptable for repair.  Follow instructions or established local procedures for completing vinyl welding repairs.

C. Testing for Performance

  • None

D. Repackaging

  1. Roll berm and band for storage. (see photos below for details)
  2. Suggested packaging is 1 each in NFES #000513 carton (36” x 24” x 17”).

EXAMPLE ROLL FOR PLACING IN #000645 CARTON

Fold left side to center.

Fold right side to center.

Roll up folded berm.

Tie rolled berm with twine.

Place rolled and bound berm in box.

 

 

NWCG Latest Announcements

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module