Skip to main content

Blower – Mist, Leaf Blower

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
007040
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there are no signs of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if the unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment procedures

A. Cleaning

  1. Remove dirt and oil using compressed air or detergent and shop towels as necessary.
  2. Use pressure washer and degreaser to remove heavy deposits of oil and grease.
  3. Equipment should be repaired and tested as quickly as possible after pressure washing to minimize rust formation on metal parts.

B. Repair

  • This equipment is primarily serviced at a “factory authorized” repair facility. Ensure that the servicing repair facility has a copy of this refurbishment standard.

C. Test for Performance

  1. Refer to the owner’s manual for operations and specifications information specific to blower model.
  2. Check condition of fuel mix; ensure fuel is fresh and the correct mix oil ratio is used prior to starting the engine. Use a fuel stabilizer in fuel during testing to help ensure proper operation of engine at post storage start up.
  3. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  4. Engine should: Start easily, run smoothly, be free of fuel leaks, and provide sufficient power to the blower attachment.
  5. Ensure all engine operational controls are functioning properly; stop switch, throttle and choke.
  6. Ensure fuel geyser danger sticker is present and legible. Reference cache memo 17-2 below.
  7. Test for blower performance (see owner’s manual for specific performance data).
  8. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  9. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of fuel.

D. Repackaging

  1. Use a nylon “zip-tie” to tie off (seal) starter rope to the handle grip.
  2. Attach a certification tag that indicates date last tested (DLT), property #, and name of inspector certifying the performance.
  3. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

NWCG Committees Observe Suicide Prevention Awareness Week: September 7-13, 2026

Date:  September 8, 2026
Questions? 
Please contact: Health and Wellness Subcommittee

The NWCG Health and Wellness Subcommittee (HWSC) and Safety/Risk Management Committee (SRC) recognize the unique challenges and demands faced by the wildland fire community. The HWSC and SRC know that we are all stronger together and believe in fostering a culture of support, understanding, and resilience.

Suicide Prevention Awareness encourages us to actively connect with and support each other. For more information that could make a difference for yourself or someone else please review the materials and resources provided for the 2026 Suicide Prevention Awareness Week.

References:

2026 Letter from Leadership

988 Suicide & Crisis Lifeline

Health and Wellness Subcommittee

Safety and Risk Management Committee

2025 Paul Gleason Award Winners Announced

Date:  August 13, 2026
Questions? 
Please contact: Leadership Development Subcommittee

The NWCG Qualifications Management Committee (QMC) and Leadership Development Subcommittee (LDSC) are proud to announce the recipients of the 2025 Paul Gleason "Lead By Example" awards. Award categories include Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision.

Congratulations to the awardees:

  • Hunter Bell, U.S. Forest Service — Initiative and Innovation
  • Shannon Deane, U.S. Wildland Fire Service— Initiative and Innovation
  • Chris Delaney, U.S. Wildland Fire Service — Motivation and Vision
  • Sean Peterson, U.S. Forest Service — Mentoring and Teamwork

References:

Paul Gleason Lead By Example Award

Wildland Fire Leadership Development Program (WFLDP)

Leadership Development Subcommittee

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91