Skip to main content

Loop Fire (California) – November 1, 1966

This Day in History is a brief summary of a powerful learning opportunity and is not intended to second guess or be judgmental of decisions and actions. Put yourself in the following situation as if you do not know the outcome. What are the conditions? What are you thinking? What are YOU doing?

Today’s 6MFS is dedicated to the 12 El Cariso Hotshots who lost their lives and the 11 others who received life-threatening burns on the Loop Fire.

We as firefighters can most honor them by recognizing and cherishing the lessons
they have imparted to us at the greatest price.” Paul Gleason

Incident Summary:

The Angeles National Forest in Southern California is known for its steep, rocky terrain and common strong, dry downhill wind, known as Santa Ana winds. At 0519, a fire was started by a faulty electric line at the Nike Missile Site on an exposed ridge at the head of Loop Canyon. Chamise, sage, and sumac were the dominant fuels, with critically low live fuel moistures. Santa Ana conditions prevailed, and the fire was driven downhill rapidly by 60 mph northeast winds toward an urban area at the bottom of the canyon. The temperature was 73 °F with 15% relative humidity (RH). At 0520, a lookout reported the fire. At 0536, initial attack takes place. At 0600, more crews arrive. The Fire Weather Forecaster issued a warning at 0830 of Santa Ana conditions in the fire area, with a high temperature of 95 °F and 10% RH. Firefighters were experiencing east-northeast winds at 40 to 60 mph. At 1300, the temperature was 80 °F with 12% RH.

 

The El Cariso Hotshots arrive at Contractors Point above Loop Canyon at 1430. They receive instruction to leapfrog the other crews and cold trail down the east flank. Much of the fire’s edge was in or near a chimney canyon. Winds were decreasing but with continued considerable channeling and eddies. At 1500, the El Cariso crew decided it was possible to cold trail down the chimney and tie in with the crews working the lower edge of the fire. It was noted that there was no clean black. Only 500 feet away from tying in with cat lines at the bottom at 1535, the terrain was too steep. They decided to go indirect 50 to 100 feet away from the fire’s edge. They were working in an area of unburned fuel and hazardous topography and were unaware that the fire had established a hot spot at the base of the chimney below them, burning in sumac bushes and heavy litter.Their escape routes were inadequate. At 1545, flare-up occurs and a “reverse tool order” (turn back and get out fast) was immediately given to the crew.

 

In less than 1 minute the fire flashes through the 2,200-foot chimney, overcoming the 23 firefighters.


Discussion Points:

The Fire Record 1966 shield graphic showing flames,and thunderbolt in front of mountains and timber.In 1966, this incident made us recognize the need for downhill line construction guidelines.

The El Cariso crew was not notified that the assignment had previously been turned down.

  • Review How to Properly Refuse Risk in the IRPG (gray section). Identify what must be communicated and to whom if an assignment is turned down.

Crews working at the bottom of the fire saw that the fire had moved below El Cariso crew in the chimney. Unfortunately, the crew leaders could not communicate a warning to El Cariso since it was not common for crew leaders to carry or be issued radios as we do today.

  • Identify the protocol your crew/unit has in place to inform others of hazards.

When the flare up occurred, 11 crew members moved into and near an emergency survival area. Personal protective equipment (PPE) and fire shelters would have lessened the severity of their injuries.

  • Ensure your crew has the appropriate PPE, that it is in good condition, and they know how to wear/use it correctly.

Many firefighters across the country will fight fire in Southern California at some point in their careers.

  • What unique topographic, weather, and fuel conditions require you to be watchful?

Special thanks to Rich Leak, Ed Cosgrove, and the El Cariso Hotshots for sharing their stories and history.

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Share on Social Media

Last Modified / Reviewed:

NWCG Latest Announcements

2025/2026 Leadership Campaign Quarter 2 Now Available!

Date: February 13, 2026
Questions? 
Please contact: Leadership Committee

NWCG is excited to announce that the Quarter Two materials for the 2025/2026 Wildland Fire Leadership Campaign are now available! This annual initiative invites all leadership and wildland fire management students to engage with essential skills and knowledge needed to lead effectively in dynamic environments.

This quarter focuses on Leadership Level 2: New Leader (Conveying Intent). Conveying intent is a crucial leadership competency in the high-risk, dynamic environment of wildland firefighting. Months 4 - 6 will concentrate on how successfully conveying intent enhances situational awareness, promotes shared understanding, and empowers firefighters to exercise initiative and adapt to changing conditions.

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Committee

Opportunity to Serve the Wildland Fire Community as an IPTM SME!

Date: February 10, 2026
Questions? 
Please contact: NWCG SME Specialist

NWCG is seeking experienced wildland firefighters and support personnel to serve as Subject Matter Experts (SMEs) for the Incident Performance and Training Modernization (IPTM) initiative. The intent of IPTM is to transition NWCG’s training and qualification system to a performance-based model through updated position descriptions, Incident Position Standards, Next Generation Position Task Books (Next Gen PTBs), and updates to training where needed.

NWCG is currently recruiting SMEs for the following positions:

  • Aircraft Timekeeper (ATIM)
  • Compensation/Claims Unit Leader (COMP)
  • Cost Unit Leader (COST)
  • Crew Representative (CREP)
  • Deck Coordinator (DECK)
  • Fire Effects Monitor (FEMO)
  • Field Observer (FOBS)
  • Geographic Information System Specialist (GISS)
  • Ordering Manager (ORDM)
  • Receiving/Distribution Manager (RCDM)
  • Staging Area Manager (STAM)

Projects begin April/May 2026 and require 15–20 hours per month for 6–8 months, including a five-day workshop in Boise, Idaho this May. Apply by February 27, 2026, at the link below and review the attached document for details.

References:

NWCG SME Interest Sign-up

IPTM Subject Matter Expert Duties and Expectations Document

Incident Performance and Training Modernization (IPTM)

NEW! M-280, Resource Advisor, Fireline (Instructor-Led) Course Available Now

Date: January 29, 2026
Questions? 
Please contact: Resource Advisor Subcommittee

NWCG is pleased to announce the new M-280, Resource Advisor, Fireline (Instructor-Led) course is now available. This training supports individuals working towards Resource Advisor, Fireline (REAF) incident qualifications.

M-280, Resource Advisor, Fireline (Instructor-Led) training prepares students to serve as a Resource Advisor, Fireline (REAF) as defined in NWCG Incident Position Standards for Resource Advisor, Fireline, PMS 350-112. This course presents scenarios that reflect the diverse challenges a REAF may encounter during an incident. Through these scenarios, participants gain hands-on experience and an understanding of REAF responsibilities in a controlled learning environment.

References:

Resource Advisor, Fireline Position Page

NWCG Position Standards for Resource Advisor, Fireline, PMS 350-112

M-280, Resource Advisor, Fireline (Instructor-Led)

Wildland Fire Learning Portal

2026 Updates to the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1

Date: January 23, 2026
Questions? 
Please contact: Incident and Position Standards Committee

The Incident and Position Standards Committee has updated the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

These updates address changes to incident position names and requirements for qualification, training, and experience. Updates related to the implementation of Complex Incident Management (CIM) and Incident Performance Training Modernization (IPTM) are also included.

The NWCG Wildland Fire Position Qualification Flowchart, PMS 308 has also been updated to reflect the recent changes.

References:

NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1

NWCG Wildland Fire Position Qualification Flowchart, PMS 308

IPSC Memo 26-01: January 2026 Updates to the NWCG Standards for Wildland Fire Positions Qualifications, PMS 310-1