Skip to main content

Managing Vehicle Traffic in Smoke

Smoke has the potential to cause safety hazards to vehicle traffic in the vicinity of active fires, both wildland and prescribed fires, especially at night. The following traffic-related items should be considered and addressed in local unit planning documents prior to an incident/project.

  • Identification, location, and phone numbers of local units that have law enforcement and traffic control responsibilities in the smoke-impacted areas. Review any local agreements presently in place with those agencies.
  • Identification of important public roads that may be impacted by smoke.
  • Identification of adequate equipment and trained personnel to control traffic. This may include warning signs, communications equipment (preferably not using the active fire frequency), and vehicles equipped with warning or flashing lights.
  • Identification and phone numbers of radio and television stations that can issue traffic advisories for the smoke-impacted area.
  • Identification of alternative traffic routes as part of the incident/project traffic plan.
  • Identification of traffic routes subject to temperature inversions, as well as contributory factors such as fog and ice.
  • When potential smoke-related problems are identified:
    • Advise the Incident Commander, Burn Boss, or Agency Administrator that severe smoke exists.
    • Notify local law enforcement units and highway departments of a potential problem.
    • Implement preplanned actions such as posting smoke warning signs.
    • Ensure that proper equipment is ready and appropriate personnel are briefed on contingency plans and are available to control traffic.

 

Category

Last Modified / Reviewed:


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

NWCG Latest Announcements

ETC Bulletin 25-001: Retrofitted Hot/Cold Beverage Kits - 2025 Field Season

Date: April 16, 2025
Questions?  Please contact:
Equipment Technology Committee

Due to spout failures and the associated risk of burn injuries, manufacturers have retrofitted the Hot/Cold Beverage Kits using a heat-shrinking band to secure the black spout at the insertion site. The updated kits feature a fluorescent label on each full kit assembly for easy identification. Catering units are encouraged to confirm the clear heat-shrinking bands are intact around each spout before filling.

ETC Bulletin 24-001 regarding Hot/Cold Beverage Kits has been archived and replaced by ETC Bulletin 25-001 for the 2025 season.

References:

NWCG Alerts

ETC-EB-25-001 Retrofitted Hot/Cold Beverage Kits

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412