Skip to main content

Generator – Gasoline Engine, 3 to 6 KW w/Ground Rod

NFES #
000709
Category
Small Engine Equipment
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
Date Last Tested (DLT) not to exceed 12 months.

Initial Inspection/Disposal Criteria

  1. Visually inspect for evidence of use (dust, oil, starter seal broken), damage or missing parts.
  2. Return to stock if there is no sign of use or damage and date last tested (DLT) does not exceed 12 months.
  3. Refurbish as necessary if unit has been used or fueled, damaged, or shelf life is exceeded.
  4. Dispose of the unit if it is not economically repairable.

Refurbishment procedures

A. Cleaning

  • Remove dirt and oil using compressed air or detergent and shop towels as necessary

B. Repair

  1. Check condition of engine oil. If engine is equipped with an engine oil filter; replace the filter at each oil change.
  2. Check condition of spark plug and air filter, clean or replace as needed. Foam type air filters can be cleaned, re-oiled with “foam filter oil” and reinstalled.
  3. Inspect power-head (engine) for freeness of all moving parts, ensuring that the crankshaft, piston/cylinder and all engine bearings are not damaged.
  4. Check for loose and/or missing parts or mounting hardware; tighten or replace where needed.
  5. Inspect exhaust system; make sure there are no cracks and or leaks.
  6. Clean spark arrestor screen of excess carbon build up, replace if screen is damaged.
  7. Inspect fuel tank, filler cap, fuel line and fuel filter; clean, repair and/or replace as needed.
  8. Ensure that the recoil starter operates properly and that the rope is not frayed or Ensure proper condition of battery (if equipped).
  9. Ensure all decals (operations and warning) are affixed and legible.

C. Test for Performance

  1. Refer to the owner’s manual for operations and specifications information specific to generator model.
  2. Ensure gasoline is fresh prior to starting the engine. Use a fuel stabilizer in fuel during testing to help ensure proper operation of engine at post storage start up.
  3. Ensure recoil starter functions properly. Check for damage or fraying of pull cord; repair or replace as necessary.
  4. Engine should start easily, run smoothly, be free from fuel leaks, and provide sufficient power to the electrical generator.
  5. Ensure all engine operational controls are functioning properly; stop switch, throttle and choke.
  6. Test for engine performance and electrical output (see owner’s manual for specific performance data).
  7. Should any function fail a test, refer to the manufacturer’s repair manual and troubleshooting guide to correct the problem.
  8. Remove all gasoline from fuel tank and run engine until carburetor is completely empty of fuel.

D. Repackaging

  1. Ensure grounding rod is attached to frame.
  2. Use a nylon “zip-tie” to tie off (seal) starter rope to the frame. 
  3. Attach a certification tag that indicates date last tested (DLT), property #, and name of inspector certifying the performance.
  4. Ensure that all identification (property #, serial #, owner ID) is affixed and legible.

 

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902