Skip to main content

PMS 448

Heater – Propane, Outdoor, 360° Radiant Heat

NFES #
006187
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Visual inspect for missing parts (guards, knobs, etc.) or any structural damage preventing repair. Inspect for torn or cut heater element, damaged or cracked hose/hose connections, loose fittings, and damage to regulators.
  2. Inspect hoses for cracks, inspecting for breaks by flexing.
  3. Inspect hose or valve for foreign material that might cause a blocked line.
  4. Inspect O-rings on supply hose and replace if needed.
  5. Inspect for out-of-round fittings by screwing regulator into tank POL fitting.
  6. Return to stock if item passes initial inspection, passes Testing for Performance, is clean, and is serviceable.
  7. Refurbish heater if any damage is repairable, missing or damaged components are available, and it’s economically feasible to refurbish.
  8. Dispose of heaters that have structural damage that prevents repair. Salvage parts that are serviceable for future repairs. Dispose of damaged regulators and cracked or damaged hoses.
  9. Ensure the heater is equipped with a SAFETY TIP-OVER SWITCH (SEE ATTACHMENT).
  10. If not equipped with SAFETY TIP-OVER SWITCH remove from service.

Refurbishing Procedures

A. Cleaning

  1. Clean the outside of the heater using a damp cloth. DO NOT clean the heater by spraying water on it.
  2. Clean the inside of the heater using compressed air.

B. Repair

  1. Replace regulator if there is any damage to the regulator or threads do not properly seat.
  2. Replace or straighten any damaged or bent parts.
  3. Repair or replace auto shut off valve if not working properly (if applicable.)
  4. Replace any damaged or cracked hose or hose connections.

C. Testing for Performance

  1. Prior to testing use an air hose to blow unit off of any dust, dirt or debris.
  2. Perform initial inspections prior to testing.
  3. Ensure a fire extinguisher is in the work area prior to lighting any heater.
  4. Mount or connect the heater to a LP-Gas supply cylinder.
  5. Turn on gas supply to the heater and check all fittings and connections for gas leaks using mild soap and water solution. NEVER INSPECT FOR LEAKS USING A MATCH OR ANY OTHER TYPE OF FLAME. Should a gas leak occur, shut off the gas supply to the heater immediately and wait a minimum of five minutes before repairing the leak.
  6. When assured that there are no leaks, light heater/pilot. If heater/pilot does not ignite within 5 seconds, extinguish flame and shut off gas valve. Wait 5 minutes before retrying.
  7. (#006139 heaters) Once pilot is lit, let run for 3-5 minutes, try on/off cycle 2 to 3 times.
  8. (#006187 heaters) Once pilot is lit, turn heater on, let run for 3-5 minutes; try on/off cycle 2 to 3 times.
  9. If heater fails, determine if economical to repair, send to a certified repair shop.
  10. Inspect auto shut off valve is in working condition by tipping unit over (if applicable.)

D. Repackaging

  • Use Carton NFES 8199 16 x16 x 36 1 EA 
  • Palletize so Heater is situated upright (if feasible)

E. Attachments

Image
NFES 6187 showing Tip-Over Safety Switch on underside of heater unit.

 

NWCG Latest Announcements

Updated NWCG Standards for Course Delivery, PMS 901-1 and NWCG Training Course Completion Certificate, PMS 921-1

Date: July 17, 2024
Contact: Training Delivery Committee 

The Training Delivery Committee (TDC) has updated the NWCG Standards for Course Delivery, PMS 901-1 to reflect changes in the standards for course management and delivery. These changes have been reviewed and approved by the members of TDC over the past year. Significant updates include additional delivery methods, updated definitions, and instructions for the use of digital signatures on training certificates. The NWCG Training Course Completion Certificate, PMS 921-1 has been updated to lock after an electronic signature has been applied.

References:

NWCG Standards for Course Delivery, PMS 901-1

NWCG Training Course Completion Certificate, PMS 921-1

IBC Memo 24-01: OF 297 Signature Order and 2024 Fire Season Use IBC Memo 24-02: Summary of Changes for SIIBM, PMS 902

Date: July 15, 2024
Contact: Incident Business Committee 

The NWCG Incident Business Committee (IBC) has recently released two memorandums. The first provides direction on the use of the Emergency Equipment Shift Ticket, OF 297 for the 2024 fire season. Due to delays in hard copy printing, both the 2024 revision and the older version of the Emergency Equipment Shift Ticket, OF 297 are acceptable for use during the 2024 fire season.

The second memorandum documents the updates of the newly revised NWCG Standards for Interagency Incident Business Management (SIIBM), PMS 902. The summary of changes attached to the memo covers the major updates and process changes from the 2022 version.

References:

IBC Memorandum 24-01: OF 297 Signature Order and 2024 Fire Season Use

IBC Memorandum 24-02: Summary of Changes for the NWCG Standards of Interagency Incident Business Management, PMS 902

IBC Memorandum 24-02 Attachment: Summary of Changes

NWCG Standards for Rapid Extraction Module Support, PMS 552

Date: July 10, 2024
Contact: Incident Medical Unit Subcommittee 

A new publication from the Incident Medical Unit Subcommittee is now available. The NWCG Standards for Rapid Extraction Module Support, PMS 552 will be used as a guide and as an opportunity to begin to build out Rapid Extraction Module Support (REMS) modules for the remainder of Fire Year 2024. These standards will be fully implemented as the minimum standard starting in January 2025.

NWCG Standards for Rapid Extraction Module Support outlines the roles, duties, qualifications, and equipment pertinent to REMS. A REMS team, strategically stationed at wildland fires, plays a pivotal role in prioritizing swift access and medical treatment to injured or ill firefighters for safe and efficient egress off the fireline. This ensures their rapid transport to definitive medical care in cases of emergency during firefighting operations, highlighting the invaluable contribution of the REMS team to firefighter safety and well-being.

References:

NWCG Standards for Rapid Extraction Module Support, PMS 552

National Wildland Firefighter Day

Date: July 2, 2024
Contact: National Interagency Fire Center 

The National Wildfire Coordinating Group (NWCG) would like to recognize July 2, 2024, as National Wildland Firefighter Day (NWFFD). Established in 2022, NWFFD honors the dedication of wildland firefighters and support personnel. This day falls within the 2024 Week of Remembrance (June 30 - July 6), providing an opportunity to renew our commitment to wildland firefighter safety while remembering those who have fallen in the line of duty.

NWCG continues to provide leadership to enable interoperable wildland fire operations among federal, state, local, Tribal, and territorial partners. NWCG standards and training establish common practices to contribute to safe, effective, and coordinated national interagency wildland fire operations.

References:

NWCG.gov

Week of Remembrance

National Wildland Firefighter Day