Torch – Drip, 1 1/4 GL (4.7L) Capacity

NFES #
000241
Category
Fuel Handling
Updated
Storage and Shelf Life Checks
None

 

National Caches will no longer refurbish non-OSHA approved torches.

Non-OSHA approved torches must be removed from service by June 2019

Please Note: Lock collar and stem apparatus are not interchangeable between manufacturers and can cause major leaks and fire hazards. Keep the lock collar, stem, and body of drip torch together throughout the inspection, repair, and refurb process. See ETC Safety Warning and Cache Memo for more information.

ETC Safety Warning 21-01, Drip Torch Lock Rings Detaching (nwcg.gov)

Drip Torch Lock Ring Cache Memo 2021

Initial Inspection/Disposal Criteria

  1. Visually inspect tank for cracks, splits, and obvious damage that may cause tank to leak.  Ensure lock ring and threads are not damaged and seal properly and air breather tube is not broken or missing.  Ensure that discharge plug and chain are attached to tank cover assembly.  Visually inspect for correct alignment of igniter, fuel trap and fuel outlet.
  2. Return to stock if item is clean, undamaged, and in unused condition.
  3. Refurbish if economically feasible and parts are available
  4. Dispose of item if it fails inspection and is damaged beyond repair.
  5. Salvage usable components and parts for future repairs. 

Refurbishing Procedures

A. Cleaning

  1. Remove and properly dispose of any residual fuel before any refurbishment.
  2. Steam clean or wash with mild degreaser soap, rinse with water, inspect for and remove any scab deposits inside tank.
  3. Carbon buildup on the igniter and screen can be cleaned with wire brush as necessary. If carbon buildup is excessive on wick, replace as needed.
  4. Tighten screw that holds igniter and screen in place.
  5. Thoroughly dry all components with clean rag and air hose. Use air hose to blow wick dry and blow air through stem to ensure no water is trapped.   

B. Repair

  1. Replace igniter if screen is ruptured, crushed, or wick material is burned out.
  2. Ensure that the alignment of; igniter, fuel trap, and fuel outlet is correct (see figure 4 below).  Tighten screw that holds igniter and screen in place.
  3. Install discharge plug into the fuel outlet seat.
  4. Insert spout into tank and tighten lock ring.
  5. Replace worn flammable liquid labels if damaged.
  6. There are several different manufacturers of drip torches. Do not mix the components as the drip torch will not function correctly or will leak.

C. Testing for Performance 

  1. With torch in operational configuration, fill tank with water to check for leaks, turn drip torch with spout down, open vent, water should flow, close vent water should stop.
  2.  Repair any deficiencies found.
  3. Drain and let dry completely before repackaging. 
  4. Remember that parts from differing manufacturers are not interchangeable. Keep components together throughout the process.

D. Repackaging

  • 1 EA in NFES #008189 carton (16” x 8” x 8”)

 

Pictured (figures 1 & 2) are two D.O.T. approved shipping containers.

  1. Note the UN Markings and Flammable Liquid Label.  Drip Torch cans without these Markings and Label may not be used to transport fuel.
  2. The red can is the ‘NEW’ OSHA approved can for fuel dispensing.
  3. Non-OSHA approved torches, including those not powder coated red, must be removed from service by June 2019.

Figure 1, D.O.T. approved shipping containers. 
Figure 1

 

Torch lid and bottom of tank markings. 
Figure 2

 

Torch can internal mechanism.
Figure 3

 

Exploded diagram of internal torch tank parts with part numbers listed.
Figure 4

 

 

Reference

<p>
<a href="http://fs-dev-nwcg.s3.us-gov-west-1.amazonaws.com/s3fs-public/2023-08/e…; target="_blank">Equipment Bulletin:&nbsp; ETC-EB-01:&nbsp; Phase-Out of Drip Torches That Do Not Comply With US DOT and US OSHA Specifications (pdf)</a></p>

<p>
<a href="/publications/pms442" target="_blank"><em>NWCG Standards for Transporting Fuel</em>, PMS 442</a></p>

<p>
<a href="/publications/pms443" target="_blank"><em>NWCG Standards for Ground Ignition Equipment,</em> PMS 443</a></p>

<p>
&nbsp;</p>

<p>
&nbsp;</p>

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902