Skip to main content

Tank – Collapsible, 1500 GL (5678.1L)

NFES #
000589
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Separate tanks by NFES number. Inspect for punctures, tears.  Look for damaged couplings, and drain plugs.  Inspect flanges and make sure threads are not damaged.
  2. Ensure ball bearings on fitting are working properly.  Repair or lube if necessary.
  3. Inspect seal around flange.  Replace to 2 ½” female flange if tank return is equipped with fittings other than.
  4. Return to stock if unused.
  5. Refurbish item if tears and holes are repairable with local equipment and expertise.  Contact manufacturer for repairs requiring materials or skills not found at the local cache to determine if it is economically feasible to have manufacturer repair tank.
  6. Dispose of item if unable to refurbish.

Refurbishing Procedures

A. Cleaning

  1. Elevate tank, securing the tank to lifting system with a chain or straps to bear the weight of the tank.
  2. Clean tank, inside and outside, with soapy water and a brush.
  3. Rinse well with clean water from high-pressure washer.
  4. Allow to air dry on both sides.

B. Repair

  1. While tank is suspended, mark any holes or damage needing repair.
  2. Patch any hole or tears.  Small pin hole can be repaired with manufacturer recommended TEAR-AID® Type B or other similar material recommended by the tank manufacturer.  Larger holes should be patched with material recommended by the manufacturer utilizing a vinyl welding process.  For extremely large holes, contact the tank manufacturer for recommended repair or replacement options.
  3. Replace all damaged hose couplings and drain plugs.
  4. Stencil correct NFES # of item on collar of tank if missing or unreadable.

C. Testing for performance

  1. Check all patches to insure they are secure and there are no loose edges.
  2. Suspend tank again to spot holes while looking towards light.

D. Repackaging

  1. Fold or roll tank as tightly as possible, secure with plastic banding or rope to keep from unrolling.
  2. 1 each of NFES  #006030, #006031, #007744 in NFES #008158 carton (48” x 22” x 31”).
  3. 1 each of NFES #000090, #000588, #000589, #000668, #000568 recommended in NFES #000500 carton (22” x 22” x 36”).

 

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902