Skip to main content

Net – Cargo, 15’X 15’, 6,000 lb. Capacity

NFES #
000458
Category
Aviation
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria  

  1. Inspect for fraying or deterioration of lines. Ultraviolet exposure is the most important factor in the degradation of the strength of the cargo nets constructed from polypropylene rope, not use or age. There is no visual or other field inspection technique that will guarantee that a cargo net is free from degradation due to ultraviolet exposure. However, if the net is free of brittleness, has no more than 10 percent broken strands in any two adjacent cycles, and there is no chalking or other visible damage, then the net is probably safe for further use.
    • Inspect for more than 10 percent of strands in any two adjacent cycles of the net being broken.
    • Inspect for brittleness by bending several areas of the nets rope 180 degrees back on itself. If more than two strands break per bend, dispose of net, or return to manufacturer for repair.
    • Inspect for chalking by running a lightly grasped hand over several of the ropes in the net. If small, white, chalk-like fragments of the rope come off in your hand then chalking has occurred. If chalking is present, it is likely that the net has received enough ultraviolet exposure to cause embrittlement and the net must be further inspected for broken strands.
  2. Inspect all ropes for fraying, burns, or wear points. All netting cord strands at splices and terminations should be free of fraying and unraveling. Netting terminations on the perimeter rope (purse strings) must have a metal thimble. All splices and terminations shall incorporate a minimum of four tucks back into the netting ropes. All rope terminations and splices should be visually inspected for the minimum number of tucks. Note that due to the length of some of the rope ends past the splice, some rope ends were tucked between other rope strands to constrain the extra rope. This is an acceptable condition for the net.
    • NFES 000458 cargo nets manufactured by Lift-It Manufacturing, Inc. in 2016 under contract number AG-82X9-P-16-6013 will have rubber electrical tape wrapping the polypropylene rope ends. Inspect rope ends to ensure tape is in place. If there is no tape, see Cache Memo 20-01 and taping instructions in Reference Section below for additional information.
  3. Inspect netting for contamination by fuel oils or other liquids considered degenerative to netting.
  4. Verify an identification tag is attached to every net. If a tag is not attached, attach one but only if the chain of custody can be verified. There are many companies that make similar looking nets that are not of the same capacity. If the chain of custody cannot be verified, the net must be taken to a net manufacturer and proof tested to twice its Workload (e.g., tested to 6,000 lbs.) for a 3,000 lb. net. (Note: It has been found that the cost to perform this test for a net missing its tag is about ¾ the cost of new net. The custodian of the net should consider the economics before sending the net out for proof testing.)
    • Replacement tag info should include NFES #, Working Load Limit (WLL) in pounds, i.e., 3,000 lbs. /6,000 lbs., cache identifier and date.
    • Inspect loop thimbles for cracks, wear, and deformation. Ensure thimbles are not loose from net and easily removed.
    • On some heavy cargo nets (NFES #000458), the mesh intersections are fixed with molded plastic crosses. These should be visually inspected for cracks and missing parts. Remove from service if broken or missing components are identified.
    • Any NFES #000795 net that is constructed of black mesh must be taken out of service.
    • Return to stock if items pass inspection, are clean, and in unused condition.
    • Refurbish if deemed necessary through inspection and repairs economically feasible.
  5. Dispose of item if refurbishment or repair will not correct deficiencies identified during the inspection process.

Refurbishing Procedures

A. Cleaning

  1. Clean all dirt from netting.
  2. Remove all flagging, string, and rope.
  3. Hang or stack polypropylene nets and clean with water from high-pressure hose.
  4. Dry completely before packaging.

B. Repairs

Any repairs should be completed by net manufacturers.

C. Testing for Performance

none

D. Repackaging

Suggested cartons are: 

  • Package 1 each in NFES #000645 carton (42” X 13.5” X 14”)

 

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902