Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect the following:
    1. Shelter – Do not open polyvinyl liner for inspection.  
      1. Large size fire shelters were not produced until after 2006, so NWCG Equipment Advisory 22-03 does not apply.
      2. Check to ensure that the bag has been modified to include small slits under the pull tabs as per NWCG Equipment Advisory 21-01. Retro fitted bags will have an orange dot sticker on the bag. New bags will have the slits and no sticker.
      3. Inspect polyvinyl bag for cuts, puncture, or torn seams. If the bag has any anomaly that may affect the integrity of the bag or the shelter, remove shelter from service.
      4. Inspect that the red pull rings are unbroken and the quick-opening tear strip is sealed to the bag the entire length and is unbroken. Dispose of shelters with damaged or missing red tear strip.
      5. Look through bag at the shelter for tears in shelter material along seams. If any tears are evident in the shelter material or polyvinyl bag, or if significant gray discoloration of the interior of the polyvinyl bag has obscured interior inspection, remove shelter from service and dispose.
      6. Further inspection should include identifying PVC bags which have unreinforced yellow pull tabs. Per Cache Memo #07-4 “Polyvinyl Bag Retrofit” Some shelters may have a glued webbing reinforcement visible on the PVC bag yellow pull strap. Any shelter lacking webbing reinforcement (glued or stitched) should be removed from service.
      7. Fire shelters with a yellow re-bag label or lacking any label inside of the PVC bag should be removed from service.
  2. Return to stock if item is new or like new, passes inspection, and does not require refurbishment.
  3. Refurbish if item passes inspection but light cleaning is required.
  4. Dispose of item if it fails inspection.
    1. Shelters that show signs of damage can be used as practice shelters. Clearly identify each as PRACTICE ONLY. This item may be used for practice when clearly marked as practice only.

Refurbishing Procedures

A. Cleaning

Do not open polyvinyl liner for refurbishment.

  1. Clean the Shelter with a damp cloth.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  1. 10 each of NFES #000925, #000975, #000926, #000973 in NFES #008059 carton (24” x 12.5” x 10”).
  2. 100 each of NFES #000927 in suggested NFES #002006 carton (23” x 19” x 10”).

 

 

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902