Skip to main content

Public Information Officer

decorative banner: photos firefighters with the word ARCHIVED

 

This position has been archived.

 

Date: Jan 2023

Position archived.

Date: Mar 2022

Removed: IS-700, NIMS: An Introduction from required training.

Date: Feb 2022

Added: PIO1 position endorsement approved 01/19/2022.

Date: Oct 2021

Remove: ICS-100, Introduction to ICS and ICS-200, ICS for Single Resources and Initial Action Incidents from Required Training.

Added:  S-203, Introduction to Incident Information OR E/L952, All Hazards Position Specific Public Information Officer to Required Training.

Added: Satisfactory performance as a Public Information Officer, Technician (PIOT) to Required Experience.

Added: Public Information Officer Type 2 (PIOT) to "PIOF Maintains Currency for These Positions."

Added: to "Other Training Which Supports Development of Knowledge and Skills:"

Removed:  S-110, Basic Wildland Fire Orientation from "Other Training Which Supports Development of Knowledge and Skills:"

Date: Oct 2015

Added: Intermediate ICS for Expanding Incidents (ICS-300) and Advanced ICS (ICS-400) as required training to align position with FEMA Type 3 standards.
Added: Transition Plan

  • All qualified individuals will remain qualified. Individuals will be granted ICS-300 and ICS-400 in responder’s records at the time of implementation.
  • All PIOF trainees will be required to complete ICS-300 and ICS-400 prior to position qualification.
Date: Jun 2011

Added: Introduction to Incident Information (S-203), Introduction to ICS (ICS-100), Wildland Fire Service (L-180), Introduction to Wildland Fire Behavior (S-190), Firefighter Training (S-130), Human Factors in the and Annual Fireline Safety Refresher (RT-130) as Required Training.

Date: Apr 2006

Position created.

The title of Information Officer Type 3 (IOF3) has been changed to Public Information Officer (PIOF). This position is entry level, is not a prerequisite for higher qualifications, and is not tied to the complexity of an incident.

USWDS Paragraph Bundles

Steward:
Key Stakeholder(s): Incident Command Subcommittee


Last Modified / Reviewed:

Please Provide Feedback

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514