Skip to main content

PMS 448

Blanket – Bed, Wool, 66" x 84"

NFES #
000441
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for visible stains, rips, burns, or tears, mend if economically feasible, if not dispose of.
  2. Inspect for possible mildew, if so dispose of.
  3. Inspect for liquids and other contaminants such as body fluid.
  4. Return to stock if item is in clean serviceable conditions with no soiling, use or damage.
  5. Dispose of item if unable to repair.
  6. Refurbish if the item needs to be cleaned and/or damage can be repaired economically.

Refurbishment Procedures

A. Cleaning

  • Wool blankets must be DRY CLEANED ONLY.

B. Repair

  • Use a professional seamstress or laundry service that provides mending services.

C. Testing for Performance

  • None

D. Repackaging

  1. Individually pack in plastic or waterproof bag.
  2. Pack 15 each in NFES #000644 carton (33” x 16” x 22”).

 

NWCG Latest Announcements

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module