Skip to main content

PMS 448

Sprayer – Handheld, 1-4 Gallon

NFES #
009981
Category
Camp
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for sanitizing solution in container. If any, dispose of properly.
  2. Inspect for indelible writing or marks on the tank. If it can not be removed, salvage available parts, and dispose of tank.
  3. Inspect for leaks or separation along any seams, or screw in connection points. Dispose of container if any are present.
  4. Inspect inside of container for any foreign matter that cannot be removed or identified. Dispose of container if this has occurred
  5. Inspect all threads, moving parts, locking mechanism, pressure relief valve, or spring mechanism for serviceability. If economical to repair, use only manufacturer specific parts for replacement. If not economical, dispose of sprayer.
  6. Return to stock if item does not show any signs of use and passes visual inspection.
  7. Refurbish if item has been used and/or damage is repairable.

Refurbishing Procedures

A. Cleaning

  1. Drain all existing sanitizer and dispose of properly. See Safety Data Sheet (SDS) for recommendation.
  2. Wash container inside and out with mild detergent with brush/scouring pad or power wash.
  3. Rinse thoroughly. Fill tank with clean water, use the hand pump to pressurize the tank, and spray clean water through spray wand and hose until clean.
  4. Turn upside down with lids off or open and let air dry.

B. Repair

  1. Replace gaskets if stiff, damaged, or missing.
  2. Assemble sprayer with clean water in the tank. Use the hand pump to pressurize the tank and spray water through wand. While tank is pressurized, check all connections for leaks. Replace gaskets, spray wands, or relief valves as needed and economical to repair.
  3. Replace nozzles as needed using only manufacturer replacement parts.

C. Testing for Performance

  • Assemble sprayer with clean water in the tank. Use the hand pump to pressurize the tank and spray water through wand. While tank is pressurized, check all connections for leaks.

D. Repackaging

  • Local cache option.

 

NWCG Latest Announcements

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module