Skip to main content

PMS 448

Flight Suit – Chest Size 44, Inseam 28 1/2” (S)

NFES #
000527
Category
Clothing
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for holes, cuts, tears, burns, or torn seams. Inspect hook and pile fastener missing or that does not provide adequate closure, repair or dispose of. Inspect for broken zippers or missing a sliders. Open and close the hook and pile fasteners to ensure they provide an adequate and secure closure. Open and close zipper to ensure smooth operations and secure closures.
  2. Return to stock if item is clean and all components are in good working condition
  3. Refurbish if cleaning is the only refurbishment required.
  4. Dispose of item if any damage is found in the inspection process.

Refurbishing Procedures

A. Cleaning

  1. Follow the cleaning procedures described in the publication, Nomex®- Aramid Fiber -Laundering Guide (H71603).
    Additional information can be obtained by calling DuPont at 1–800–453–8527 or by writing:
    DuPont Advanced Fibers Systems
    Chestnut Run Plaza
    Laurel Run Building
    Wilmington, DE 19880-0705
  2. Abbreviated washing procedures from above publication:
    1. “Garments of NOMEX® should be washed separately from other articles to avoid contamination with lint of flammable fibers.”
    2. “Tests show that formulations designed for use at a temperature of 140 °F (60 °C) or less – such as high-surfactant, low-alkalinity products – adequately clean NOMEX® and provide the best fabric color retention.”
    3. “For heavily stained and oily garments of NOMEX®, a higher temperature wash formula may be required for adequate cleaning.”
    4. “Garments made of NOMEX® must be adequately rinsed to remove residual wash chemicals.”
    5. “In some instances, tumble dry conditioning is the only finishing necessary for garments of NOMEX®.”
    6. “…dry cleaning is an alternative method of removing heavy soil and may be preferable to repeated high-temperature washing.”
  3. If items are taken to vendor laundry facilities for refurbishment; ensure that they receive a copy of this refurbishment standard. The laundry facility must satisfy both – the requirements as set by the manufacturer specification and the agreement made with the local agency.

B. Repairs

  • None

C. Test for performance

  • None

D. Repackaging

  • Local cache option

 

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page