Skip to main content

Can – 5 GL (18.9L), Gas, w/o Spout, Jeep

NFES #
001175
Category
Fuel Handling
Updated
Storage and Shelf Life Checks
Yes
Storage and Shelf Life Procedure
If stored outside protect from rain, snow or any form of moisture.

Initial inspection/Disposal Criteria

  1. Inspect for fuel or mixes and dispose of properly.
  2. Inspect for rust that has pitted, is flaking or is lifting the interior surface and determine extent as some “flash rust” maybe present.
  3. Inspect for leaks or separation along seams.
  4. Inspect all threads on nozzles for serviceability.
  5. Inspect spring closure devices to be sure they are functioning properly.
  6. Inspect for can integrity and uniformity, i.e. collar crushed, large dents, punctures, modifications.
  7. Inspect all cotter keys and pins.
  8.  Ensure that containers are properly marked and labeled.
  9. Ensure spark arrester screen is present, replace as necessary.
  10. Return to stock if item shows no signs of use and passes visual inspection.
  11. Refurbish if item has been used and/or damage is repairable.
  12. Dispose of item if damage is found and it cannot be repaired.

Refurbishing Procedures

A. Cleaning

  1. Drain all existing fuel.
  2. With pressure washer and detergent wash outside of container.
  3. Use a rag and air hose or some means to dry the interior of the container.
  4. Turn upside down with lids off or open to dry.
  5. Spray inside of can lightly with WD-40 or similar product.

B. Repair

  1. Replace any defective cotter key or pins.
  2. Wipe down outside of container and repaint if necessary. 
  3. Ensure container is properly marked and labeled. Color requirement for the cans are red with yellow markings. Label shall be FLAMMABLE LIQUID. Markings are dependent on fuel type and can be accomplished using NFES tags #000805, #000802, #000803, #000801.
  4. Ensure fuel geyser warning label is present and legible near spout area. Reference cache memo 17-2 below.
  5. Secure proper spout to top of can, if applicable.

C. Tests for Performance

  • None

D. Repackaging

  • None

 

NWCG Latest Announcements

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and Next Generation Position Task Book for Basic Faller Are Now Available

Date: April 14, 2025
Questions?  Please contact:
Hazard Tree and Tree Felling Subcommittee

The updated NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212, and NWCG Position Task Book for Basic Faller (FAL3), PMS 311-19 are now available.

The NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212 includes position standards designed to be used in conjunction with the Next Generation Position Task Book (Next Gen PTB). The Next Gen PTB for Basic Faller (FAL3) includes an evaluation guide with suggested rating elements to consider when assessing trainees.

References:

NWCG Standards For Wildland Fire Chainsaw Operations, PMS 212

NWCG Position Task Book for Basic Faller (FAL3), PMS 311-119

NWCG Basic Faller (FAL3)

RMC Memo 25-01: Summary of Updates to Safety Officer Positions

Date: April 9, 2025
Questions?  Please contact:
RMC Member Eric Fransted

The Risk Management Committee (RMC) serves as the position steward for all Safety Officer incident positions and continues to improve position standards, training, and naming conventions. The implementation of Complex Incident Management (CIM) required changes to position titles. RMC collaborated with the NWCG Incident Position Standards Committee (IPSC) to propose and implement these updates. 

References:

RMC Memo 25-01: Summary of Updates to Safety Officer Positions 

NWCG Position Catalog

Updated, NWCG Guide to Wildland Fire Origin and Cause Determination, PMS 412

Date: April 8, 2025
Questions?  Please contact:
Wildland Fire Investigation Subcommittee

PMS 412 provides guidance for wildland fire investigations. This guide outlines recommended procedures, practices, techniques, and methods to promote a systematic approach. The last update to this publication was in 2016.

References:

NWCG Guide to Wildland Fire Origin and Cause Determination PMS 412

Updated NWCG Standards for Airtanker Base Operations, PMS 508

Date: March 31, 2025
Questions?  Please contact:
Airtanker Base Operations Unit

The updated NWCG Standards for Airtanker Base Operations (SABO), PMS 508 standardizes operations and procedures at interagency airtanker bases to ensure safe, efficient, and effective operations in support of interagency goals and objectives.

References:

NWCG Standards for Airtanker Base Operations, PMS 508