Skip to main content

PMS 448

Kit – Shelter, 18’ Octagon

NFES #
000540
Category
Kits
Updated
Storage and Shelf Life Checks
None

This item has been deleted from the NFES catalog.

National Caches are not stocking or refurbishing this item.

Initial Inspection/Disposal Criteria

  1. Inspect packing list and instructions. Refer to NWCG National Fire Equipment System Catalog for a complete list of kit components.
    1. Assemble the mainframe and components according to instructions. All locking pins and flex joints should move easily.
    2. Inspect for burrs on all components of mainframe, eve bars, and base bars.
    3. Loosen flex joints and remove burrs as needed.
  2. Inspect and install door. Door should open and close easily.
  3. Inspect roof and wall panels for any tears or rips and repair as needed.
  4. Inspect windows and screens in wall panels. Repair or replace where necessary.
  5. Check for broken welds on key flange, repair by bolting.
  6. Return to stock if shelter was not used, all kit contents are accounted for, and the shelter is clean.
  7. Refurbish kit if the shelter was used or is missing components.
  8. Disposal of complete kits is not recommended. Seek direction from local cache management for specific disposal criteria. Components that are damaged beyond repair should be disposed of and replaced with like items.

Refurbishing Procedures

A. Cleaning

  1. Clean main frame and misc. parts with a damp cloth and mild detergent if necessary.
  2. Clean the roof and wall panels with a mild detergent and water solution. Use a brush to remove hard dirt and grime or high pressure wash. Rinse well.
  3. Air dry completely before repackaging.

B. Repair

  1. Repair or replace any part of the main frame as needed. Bolt key flange.
  2. When dismantling, wipe all component parts with a damp cloth and return to proper container.
  3. Repair any holes, tears or rips as needed.
  4. Ensure that all locking buttons snap into place.
  5. Ensure that the Velcro is dry on all panels before folding and placing in proper container.
  6. Stencil main frame with property number, stencil inside the center roof ring.
  7.  Ensure that all kit components are accounted for prior to repacking.

C. Testing for Performance

  • None

D. Repackaging

  1. Repack according to manufacturer’s instructions and local cache option.
  2. Ensure that installation/assembly instructions are included in package.

 

Reference

Replacement parts may be obtained by contacting:
Western Shelter Systems
830 Wilson Street
Eugene, OR 97402
Phone: 541–344–7267

 

NWCG Latest Announcements

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts