Skip to main content

PMS 448

Kit – Shelter, 20’ Octagon

NFES #
000549
Category
Kits
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect packing list and instructions. Refer to NWCG National Fire Equipment System Catalog for a complete list of kit components.
    1. Assemble the mainframe and components according to instructions. All locking pins and flex joints should move easily.
    2. Inspect for burrs on all components of mainframe, eve bars, and base bars.
    3. Loosen flex joints and remove burrs as needed.
  2. Inspect and install door. Door should open and close easily.
  3. Inspect roof and wall panels for any tears or rips and repair as needed.
  4. Inspect windows and screens in wall panels. Repair or replace where necessary.
  5. Check for broken welds on key flange, repair by bolting.
  6. Return to stock if shelter was not used, all kit contents are accounted for, and the shelter is clean.
  7. Refurbish kit if the shelter was used or is missing components.
  8. Disposal of complete kits is not recommended. Seek direction from local cache management for specific disposal criteria. Components that are damaged beyond repair should be disposed of and replaced with like items.

Refurbishing Procedures

A. Cleaning

  1. Clean main frame and misc. parts with a damp cloth and mild detergent if necessary.
  2. Clean the roof and wall panels with a mild detergent and water solution. Use a brush to remove hard dirt and grime or high pressure wash. Rinse well.
  3. Air dry completely before repackaging.

B. Repair

  1. Repair or replace any part of the main frame as needed. Bolt key flange.
  2. When dismantling, wipe all component parts with a damp cloth and return to proper container.
  3. Repair any holes, tears or rips as needed.
  4. Ensure that all locking buttons snap into place.
  5. Ensure that the Velcro is dry on all panels before folding and placing in proper container.
  6. Stencil main frame with property number, stencil inside the center roof ring.
  7.  Ensure that all kit components are accounted for prior to repacking.

C. Testing for Performance

  • None

D. Repackaging

  1. Repack according to manufacturer’s instructions and local cache option.
  2. Ensure that installation/assembly instructions are included in package.

 

Reference

Replacement parts may be obtained by contacting:
Western Shelter Systems
830 Wilson Street
Eugene, OR 97402
Phone: 541–344–7267

 

NWCG Latest Announcements

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53

NWCG Risk Management Committee Releases Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

Date: November 7, 2024
Contact: Risk Management Committee

The Risk Management Committee (RMC) has released Safety Bulletin: 24-001 Use of Respirators on Wildland Fires. As wildland fire respirators are available through several established vendors, wildland fire personnel need to understand regulations and limitations of respirator use in the workplace.

Safety Bulletin 24-001 outlines the following topics regarding respirator use for wildland fires:

  • Requirements for Respirator Use
  • Voluntary Respirator Use
  • Current Respirator Options
  • Unknown Risks of Respirator Use

This bulletin also provides mitigation recommendations to help reduce smoke exposure for wildland firefighting efforts.

References:

NWCG Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

NWCG Smoke Management Guide for Prescribed Fire, PMS 420-3

VIDEO: Protecting Wildfire Personnel from Smoke - How Incident Management Teams Address Smokes Risks

VIDEO: Smoke, Knowing the Risks