Skip to main content

PMS 448

Shelter – Fire, Large (Shelter Only), M2002

NFES #
000973
Category
PPE
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect the following:
    1. Shelter – Do not open polyvinyl liner for inspection.  
      1. Large size fire shelters were not produced until after 2006, so NWCG Equipment Advisory 22-03 does not apply.
      2. Check to ensure that the bag has been modified to include small slits under the pull tabs as per NWCG Equipment Advisory 21-01. Retro fitted bags will have an orange dot sticker on the bag. New bags will have the slits and no sticker.
      3. Inspect polyvinyl bag for cuts, puncture, or torn seams. If the bag has any anomaly that may affect the integrity of the bag or the shelter, remove shelter from service.
      4. Inspect that the red pull rings are unbroken and the quick-opening tear strip is sealed to the bag the entire length and is unbroken. Dispose of shelters with damaged or missing red tear strip.
      5. Look through bag at the shelter for tears in shelter material along seams. If any tears are evident in the shelter material or polyvinyl bag, or if significant gray discoloration of the interior of the polyvinyl bag has obscured interior inspection, remove shelter from service and dispose.
      6. Further inspection should include identifying PVC bags which have unreinforced yellow pull tabs. Per Cache Memo #07-4 “Polyvinyl Bag Retrofit” Some shelters may have a glued webbing reinforcement visible on the PVC bag yellow pull strap. Any shelter lacking webbing reinforcement (glued or stitched) should be removed from service.
      7. Fire shelters with a yellow re-bag label or lacking any label inside of the PVC bag should be removed from service.
  2. Return to stock if item is new or like new, passes inspection, and does not require refurbishment.
  3. Refurbish if item passes inspection but light cleaning is required.
  4. Dispose of item if it fails inspection.
    1. Shelters that show signs of damage can be used as practice shelters. Clearly identify each as PRACTICE ONLY. This item may be used for practice when clearly marked as practice only.

Refurbishing Procedures

A. Cleaning

Do not open polyvinyl liner for refurbishment.

  1. Clean the Shelter with a damp cloth.

B. Repair

  • None

C. Testing for performance

  • None

D. Repackaging

  1. 10 each of NFES #000925, #000975, #000926, #000973 in NFES #008059 carton (24” x 12.5” x 10”).
  2. 100 each of NFES #000927 in suggested NFES #002006 carton (23” x 19” x 10”).

 

 

NWCG Latest Announcements

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts