Skip to main content

Valve – Automatic Check and Bleeder 1 1/2” NH-F

NFES #
000228
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for missing parts (valves, plugs, and gaskets). Inspect for missing or damaged handle, damaged threads and fire exposure damage.
  2. Return to stock if item is clean, passes inspection, and is in unused condition.
  3. Refurbish if item exhibits damage that is repairable and item passes testing.
  4. Dispose of item if damaged beyond repair, fails Testing for Performance and cannot be repaired, or show signs of fire damage.

Refurbishing Procedures

A. Cleaning

  1. Wash with mild soap, brush if necessary.
  2. Rinse thoroughly and stand upright to dry.
  3. Lubricate female coupling with appropriate dry lubricant such as graphite. Wipe off excess.

B. Repair

  1. Replace missing or cracked gaskets and handle.
  2. Lubricate female coupling with dry lubricant such as graphite.

C. Testing for Performance

  1. Install valve on test pump.
  2. Fill with water; close handle.
  3. Attach caps or nozzle for testing.
  4. Test for leaks at 300 PSI for 3 minutes.
  5. Inspect for leaks around female coupling, the male flange, under the top of the handle shaft, on the bottom end of the handle shaft, and in the casing.
  6. Remove from test pump and ensure the check valve (flapper is operational).
  7. Retest valve after any repairs are made.

D. Repackaging

  1. Dry completely prior to packaging.
  2. NFES #008018 CARTON (12”X12”X8”) 10 PER CARTON 

 

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514