Skip to main content

Nozzle – Combination, Barrel, KK 1”

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
001081
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Inspect for burrs and cracks, broken plastic, or fire damage. Inspect gasket and replace if missing, cracked, or stiff. Inspect for screw and nylon washer. Inspect hose coupling threads for damage.
  2. Barrel must turn freely.
  3. Return to stock if nozzle functions properly, is free of damage and clean.
  4. Refurbish if nozzle is repairable.
  5. Dispose of any nozzle that is damaged beyond repair, has burn damage, or fails Testing for Performance and deficiencies cannot be corrected. Old style KK: Inspect threads inside of barrel; if they are damaged, dispose of nozzle.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect nozzles to pump or manifold. Confirm connection ends are not out of round and there is no damage to threads.
    1. Pressure Test:
      1. Start pump.
      2. Make sure nozzles are open. Let all air escape. Shut nozzles.
      3. Pressurize to 300 PSI and hold for 3 minutes
  3. Inspect for leak:
    • Around the gasket
    • Behind the barrel
    • Tip of barrel (in closed position)

B. Cleaning

  1. All items will be washed and cleaned of foreign matter, such as mud, dirt, and grease. Clean in a mild detergent with brush and scouring pad, or high pressure wash as needed. Do not soak for extended periods of time as the detergent will corrode the metal.
  2. Rinse thoroughly.
  3. Stand upright with barrel in open position to drain water and dry.

C. Repair

  1. Replace gaskets, washers, or screws as needed.
  2. Replace tip, screw, and O-ring, if needed (NFES #001081, #001082).

D. Retesting

  • Following completion of any repairs, retesting of nozzles must be completed following Testing for Performance, above.

E. Repackaging

  • Stand upright and dry completely prior to repackaging.
    • Use NFES #008064 carton (10” x 8” x 6”)  for each of the following:
      • NFES #001081 STANDARD PACK 20 per carton

 

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee