Skip to main content

Ground Ignition Subcommittee

Banner Image
GISC header graphic.   Decorative.
Mission Statement

Mission Statement

The Ground Ignition Subcommittee (GISC) provides national leadership for all program elements related to ground ignition equipment.

Body

Primary Objectives

photo of firefighter walking with a drip torch

  • Develop and maintain standards and specifications for ground ignition equipment.
  • Establish, communicate, and implement ground ignition equipment evaluation and approval processes.
  • Develop and maintain ground ignition equipment training materials, guides and manuals.

Fuel Geyser Awareness

Guidance Documents

Aluminum Fuel Bottle OSHA Supplemental Standards

Note: Small aluminum fuel bottles (commonly referred to as Sigg bottles)

Dolmar OSHA Supplemental Standards

  • No Dolmar Supplemental Standards are currently approved by OSHA.

From NWCG Standards for Transporting Fuel, PMS 442

Subcommittee Relevant Equipment Bulletins

Chair: Jeff Schardt

NWCG Coordinator: Erica Lamb

Parent Committee: Equipment Technology Committee

Meeting Schedule: TBD

Page Last Modified or Reviewed:

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514