Skip to main content

PMS 936 Symbology

View the symbology page for more information.

Symbology: Point | Line | Polygon | Secondary Symbols


Symbol Symbol Name Sort descending Category Link to NWCG Glossary (if one exists)
Two horizontal black lines with a gray line sandwiched between. Access or Improved Road Reference
Four inverted purple Vs with a horizontal purple line running through them. Aerial Hazard Air Ops
Purple circle with inverted V inside the circle. There is a red small circle inside the inverted V. Aerial Hazard Air Ops
Purple airplane inside purple circle. Airport Air Ops
White rectangle with green outline and eight horizontal green lines inside. Area Covered by IR Flight IR
Purple checkmark within purple circle. Aviation Check Point Air Ops
A line of ten purple boxes. Aviation Route Air Ops
Left and right facing brackets. Branch Break Assignment Break
Gray octagon with two opposing brackets in reverse. Bridge Reference
Blue square with reverse line forming teepee inside. Camp Logistics
Green polygon with reverse line art of trash can. Clean Up Area Repair
White X in blue square. Closure Logistics
White rectangle with black outline and cross hatch of black lines inside. Cloud Cover IR
Six green oblong dots. Completed - Inspected Line Repair Status
Solid green square. Completed - Inspection Point Repair Status
Solid yellow circle. Completed - Ready for Inspection Point Repair Status
A black line with six vertical lines on top with dots between each. Completed Burnout Ops Completed
Xs create a horizontal hash mark line. Completed Dozer Line Ops Completed
Horizontal zigzag line. Completed Fuel Break Ops Completed
Horizontal line of Hs with a line in between each one Completed Hand Line Ops Completed
Four letters M with a line after each. Completed Mixed Construction Line Ops Completed
Four capitals Ps with lines in between. Completed Plow Line Ops Completed
Four capital R's with lines in between Completed Road as Line Ops Completed
Horizontal black line Contained Perimeter Line
Half oval and tabs on each end inside a green polygon with black out line. Culvert Repair
None Defensible Prep and Hold Structure Triage
None Defensible Stand Alone Structure Triage
Blue wavy water in purple circle. Dip Site Water
Two curved lines left and right facing back to back. Division Break Assignment Break
A white drop inside green polygon with black outline. Dozer Push Repair
Blue Square. Drop Point Logistics
Horizontal green line with five green squares dispersed  evenly across it. Escape Route Safety
Horizontal dashed red line. Fence Reference
White broken fence line in green polygon with black outline. Fence - Cut/Damaged Repair
A red horizontal line with five small red vertical lines on bottom. Fire Edge (Field Collection) Fire
Red X in red circle. Fire Origin Fire
White F with tick marks inside each point of of gray hexagon.  Fire Station Reference
A line of four alternating gray triangles and purple lines. Foam Drop Air Ops
White gate inside gray hexagon. Gate Reference
Yellow triangle with a red border and black exclamation point in the middle. Hazard Safety
White pine tree inside green pentagon with black outline. Hazard Tree Repair
Purple capital H inside purple circle. Helibase Air Ops
Purple circle. Helispot Air Ops
A line of three yellow dots with three dashes in between. Highlighted Feature Reference
Small red circle inside a larger white circle with red outline. Hot Spot - Spot Fire Fire
Blue fire hydrant inside a white circle with black outline. Hydrant Water
Solid orange line with rounded ends. In Progress Line Repair Status
Point Repair Status In Progress Point Repair Status
Circle pink line. In Use - Fire Management Point Repair Status
Solid pink line with rounded ends. In Use - Fire Management Line Repair Status
Blue square with top left half corner filled with white. Incident Command Post Logistics
Three curved white bars with a dot on bottom inside blue box turned with point north. Internet Access Communications
White rectangle with red outline and cross slashes of eight red lines. IR Intense Heat IR
Small red circle. IR Isolated Heat Source IR
White rectangle with red outline and seven by five red dot pattern inside. IR Scattered Heat IR
Six white dots stacked in a pyramid inside a green pentagon with black outline. Landing or Log Deck Repair
White circle inside a gray hexagon. Landmark Reference
Solid red-orange line. Limited Action Line Strategic Operations
White binoculars inside a black square. Lookout Ops
Horizontal yellow line with black outline and two yellow dots just within each end. Management Action Point Reference
White cross in blue square. Medical Logistics
Half red circle inside white circle with purple outline. Mobile Retardant Base Air Ops
Three white dots at the end of white lines attached to a thicker white line in the center, all within a blue square, with point on end. Mobile Weather Unit Communications
Solid purple line with rounded ends. Needs Assessment Line Repair Status
Solid purple circle Needs Assessment Point Repair Status
No Repair Needed Point Repair Status
Solid line art of a house. Non-Defensible – Prep and Leave Structure Triage
Solid graphic line art of a house. Non-Defensible – Rescue Drive-By Structure Triage
A gray long dash and short dash alternate on a line. Other Reference
Gray octagon. Other Reference
White rectangle with black outline. Other Reference
Solid gray circle. Other - See Comments Point Repair Status
Solid gray line with rounded ends. Other - See Comments Line Repair Status
White square with rounded corners and blue outline with blue circle in center. Other Property Accountable Property
A pink horizontal line with three pink vertical lines and two pink dots Planned Burnout Ops Planned
A line with four cross hatched areas and gaps in between each one Planned Dozer Line Ops Planned
A pink zig-zagged line with gaps. Planned Fuel Break Ops Planned
Line of four Hs with a dash in between. Planned Hand Line Ops Planned
A line of four pink Ms with dashes in between. Planned Mixed Construction Line Ops Planned
A line of four Ps with dashes in between. Planned Plow Line Ops Planned
A line of four pink Rs with dashes in between. Planned Road as Line Ops Planned
Red diamond with black outline. Possible IR Heat Source IR
Orange rectangle with dark orange outline. Prescribed Fire Fire
Solid blue line. Primary Strategic Line Strategic Operations
Six pink squares evenly spaced out in an imaginary horizontal line. Proposed Line Ops Planned
Solid yellow-green line. Proposed Strategic Line Strategic Operations
Pump Pump Accountable Property
Horizontal goldenrod colored line. Repair Line Repair
Solid red line with rounded ends. Repair Needed Line Repair Status
Solid red circle. Repair Needed Point Repair Status
Green pentagon with black outline. Repair Point Repair
Two curved white brackets around white dot in center, all within a blue square turned on point. Repeater Communications
White exclamation point inside green pentagon with black outline. Resource Location Repair
Blue capital W in white circle with blue outline and a red slash going across W at angle. Restricted Water Source Water
Alternating four pink squares and purple lines. Retardant Drop Air Ops
White X inside green pentagon with black outline. Retardant in Avoidance Area Repair
Vertical White solid lines with a dashed line going up the middle all inside a green pentagon with black outline. Road Repair Repair
A line of eight brown dashes. Road Repair Repair
Black S inside yellow triangle with black outline. Safety Zone Safety
Solid blue-green line. Secondary Strategic Line Strategic Operations
Showing 1 - 100 of 115 entries

NWCG Latest Announcements

The Experiential Learning Subcommittee is looking for your feedback on Staff Rides

Date: September 20, 2024
Contact: Ashleigh D'Antonio and George Risko, Leadership Committee

The Experiential Learning Subcommittee needs to hear from the field about where the greatest need lies regarding staff rides and their accessibility.

  • Do you have an event you would like to turn into a learning experience?
  • Do you have a staff ride built, but are struggling to implement the delivery?
  • Do you need help building capacity?
  • What other ideas do you have to support experiential leadership training?

Fill out this short survey below to help us help you.

References:

Staff Rides: Feedback

Staff Rides

Updated NWCG Single Resource Casual Hire Information, PMS 934

Date: September 19, 2024
Contact: Incident Business Committee

The Incident Business Committee has updated the NWCG Single Resource Casual Hire Information, PMS 934. This update expands the provisions for hiring emergency personnel.

References:

NWCG Single Resource Casual Hire Information, PMS 934

IBC Memorandum 24-03

NWCG 2024 Spring/Summer Highlights

Date: September 13, 2024

Image
Forest Service Logo
Image
Bureau of Indian Affairs Logo
Image
Bureau of Land Management Logo
Image
National Park Service Logo
Image
Fish & Wildlife Service Logo
Image
State Foresters Logo
Image
U.S. Fire Administration
Image
Intertribal Timber Council Logo
Image
International Association of Fire Chiefs
Image
Department of Defense Logo

Welcome to our latest highlights from the National Wildfire Coordinating Group, where we explore the latest updates, insights, and efforts that develop interoperable wildland fire operations among federal, state, local, Tribal, and territorial partners.

The Performance Support Package, which for ABRO includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.
 


Image
NASA Logo

NASA JOINS NWCG!

The National Aeronautics and Space Administration (NASA) is officially an associate member of NWCG. As such, NASA is beginning to collaborate with wildland fire management agencies with the goal of increasing collaboration across agencies and leveraging NASA data, technology, and innovation for nation-wide efforts in wildland fire management. NASA has a rich history of research, development, and technology transfer in the areas of Earth science, space technologies, and aeronautics that support the NWCG mission.


Image
NWCG new website look.

WWW.NWCG.GOV HAS A NEW LOOK AND DESIGN

The NWCG web team dedicated the past two years to making a significant upgrade to the www.nwcg.gov site. This upgrade involved a comprehensive redesign of over 7,700 web pages.

The modernization of NWCG’s website involved migrating to Drupal 10, a cutting—edge content management system, and leveraging Amazon Web Service GovCloud for secure and efficient hosting. These upgrades help ensure that the NWCG website remains current in content management practices, offering enhanced customization, improved performance, and an overall superior user experience.


NWCG Leadership Committee

Image
WFLDP Professional Reading Program logo
Image
WFLDP PRP book covers

The Wildland Fire Leadership Development Program announced the Professional Reading Program’s 2024 list!

The years books include:

  • Young Men and Fire by Norman Maclean
  • The Wisdom of the Bullfrog by William H. McRaven
  • The Art of Clear Thinking by Hasard Lee
  • Emotional Agility by Susan David
  • Writing to Persuade by Trish Hall

Learn more at the NWCG Leadership Committee


INCIDENT PERFORMANCE AND TRAINING MODERNIZATION

In 2023, NWCG kicked off the Incident Performance and Training Modernization (IPTM) effort. A training system overhaul focused on developing a performance-based training system designed to shift training to on-the-job when appropriate.

Over the next five years, NWCG intends to analyze all positions within the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1. To date we are currently working on 30 incident positions, and planning for 20+ in calendar year 2025.

Subject Matter Experts from a variety of geographical areas and agencies recently completed the position analysis for 16 positions. From this analysis, Incident Positions Standards and a Next Generation Position Task Book will be developed for each position.

Image
Incident Performance and Training Modernization

NEXT GENERATION POSITION TASK BOOK

In April 2024, NWCG launched the new Next Generation Position Task Book (Next Gen PTB) which is a key component of the IPTM effort. This revised evaluation tool is designed to work in conjunction with the newly developed Incident Position Standards.

Major Next Gen PTB changes:

  • Structured to improve constructive conversations between evaluators and trainees.
  • Reference new Incident Position Standards.
  • Include only tasks required to be evaluated for successful performance.
  • Trainees will be rated on their performance vs. initialing whether a task was completed.
  • Must include written feedback when trainee does not meet the standard.
  • Will be position specific (no combined PTBs).
Image
Screen shot of the Next Gen Position Task Book

Image
Banner image of the Wildland Fire Learning Portal website

NWCG’s training course catalog is now available on the Wildland Fire Learning Portal (WFLP).

To access the training course catalog, visit WFLP and either set up an account or login as a guest.

 

 

The Incident Position Standards and Next Generation Position Task Book are now available for Aircraft Base Radio Operator (ABRO)

Date: September 12, 2024
Contact: Interagency Helicopter Operations Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Aircraft Base Radio Operator, PMS 350-87 and NWCG Position Task Book for Aircraft Base Radio Operator (ABRO), PMS 311-87 are now available.

The Performance Support Package, which for ABRO includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Aircraft Base Radio Operator Position Page

NWCG Incident Position Standards for Aircraft Base Radio Operator, PMS 350-87

NWCG Position Task Book for Aircraft Base Radio Operator, PMS 311-87