Skip to main content

PMS 936

NWCG Standards for Geospatial Operations, PMS 936

 

The NWCG Standards for Geospatial Operations (GeoOps), PMS 936, provides the basis for consistency in the delivery of wildfire incident GIS products and services. These standards must be adhered to for all work performed by incident Geographic Information System Specialist (GISS) to fulfill the GIS needs of the Planning Section of the Incident Management Team (IMT).

Other NWCG resources, such as job aids, checklists, and training courses, are available to develop the GISS position and to implement GeoOps. A key resource for a GISS is the NWCG GISS Workflow, PMS 936-1, a supplemental publication to GeoOps which provides the implementation instructions and documentation for the standards presented in GeoOps.

The NWCG Standards for Geospatial Operations (GeoOps), PMS 936, are developed and maintained by the NWCG Geospatial Subcommittee (GSC) under the direction of the NWCG Data Management Committee (DMC).
Prior to February 2020, these standards were known as GIS Standard Operating Procedures on Incidents (GSTOP). While previous versions may contain relevant or useful information, the GSTOP is obsolete. The user of this information is responsible for confirming that they have the most up-to-date version. NWCG is the sole source for the publication.

Comments, questions, and recommendations shall be submitted to the appropriate agency member assigned to the GSC. View the complete roster.

GeoOps Sections

  1. Event Geodatabase
  2. National Incident Feature Services (NIFS)
  3. Directory Structure
  4. File Naming
  5. Symbology
  6. Map Elements
  7. Map Product Standards
  8. Documentation
The National Wildfire Coordinating Group (NWCG) provides national leadership to enable interoperable wildland fire operations among federal, state, Tribal, territorial, and local partners. NWCG operations standards are interagency by design; they are developed with the intent of universal adoption by the member agencies. However, the decision to adopt and utilize them is made independently by the individual member agencies and communicated through their respective directives systems.

Modified / Reviewed:

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514