Skip to main content

PMS 936

PMS 936 Symbology Secondary Symbols

View the symbology page for more information.

Symbology: Point | Line | Polygon | Secondary Symbols


Symbol Symbol Name Sort descending Category Link to NWCG Glossary (if one exists)
Six green oblong dots. Completed - Inspected Line Repair Status
Solid green square. Completed - Inspection Point Repair Status
Solid yellow circle. Completed - Ready for Inspection Point Repair Status
Solid orange line with rounded ends. In Progress Line Repair Status
Point Repair Status In Progress Point Repair Status
Solid pink line with rounded ends. In Use - Fire Management Line Repair Status
Circle pink line. In Use - Fire Management Point Repair Status
Solid red-orange line. Limited Action Line Strategic Operations
Solid purple line with rounded ends. Needs Assessment Line Repair Status
Solid purple circle Needs Assessment Point Repair Status
No Repair Needed Point Repair Status
Solid gray line with rounded ends. Other - See Comments Line Repair Status
Solid gray circle. Other - See Comments Point Repair Status
Solid blue line. Primary Strategic Line Strategic Operations
Solid yellow-green line. Proposed Strategic Line Strategic Operations
Solid red circle. Repair Needed Point Repair Status
Solid red line with rounded ends. Repair Needed Line Repair Status
Solid blue-green line. Secondary Strategic Line Strategic Operations
Showing 1 - 18 of 18 entries

NWCG Latest Announcements

2024 Week of Remembrance

Date: June 27, 2024
Contact: 6 Minutes for Safety Subcommittee 

As we approach the 2024 Week of Remembrance (WOR), June 30 to July 6, we dedicate this time to thoughtfully reviewing and recognizing the events of the 2018 Mendocino Complex. As such, this year’s theme of “Learning From the Mendocino Complex” embodies a longstanding hallmark of WOR, honoring through learning.

Throughout the week, our energy will be directed toward fostering generative conversations in briefing rooms and at tailgates.

References:

6 Minutes for Safety - 2024 Week of Remembrance

Wildland Fire Lessons Learned Center

Updated NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Date: June 24, 2024
Contact: Incident and Position Standards Committee 

The June 2024 update of the NWCG Wildland Fire Risk and Complexity Assessment, PMS 236, is now available to meet the current needs for incident management typing.

The NWCG Wildland Fire Risk and Complexity Assessment should be used to evaluate firefighter safety issues, assess risk, and identify the appropriate incident management organization based on incident complexity. Assessing risk, determining incident complexity, and identifying an appropriate incident management organization is a subjective process based on examining a combination of indicators or factors, which can change over time.

References:

NWCG Wildland Fire Risk and Complexity Assessment, PMS 236

Operations Branch Director (OPBD) Next Gen PTB Available

Date: June 10, 2024
Contact: NWCG Feedback 

The NWCG Position Task Book for Operations Branch Director (OPBD), PMS 311-109 is now available for use within the OPBD position qualification pathway. As part of the transition to Complex Incident Management (CIM), the OPBD Next Gen PTB was developed and the position qualification pathway updated.

More information about the Next Gen PTB format can be found on the NWCG Position Task Book webpage.

References:

Operations Branch Director Position Page

Operations Branch Director Next Gen PTB

NWCG Position Task Books

Updated NWCG Standards for Interagency Incident Business Management, PMS 902

Date: June 5, 2024
Contact: NWCG Incident Business Committee 

The 2024 revision of the NWCG Standards for Interagency Incident Business Management, PMS 902 is now available. The uniform application of interagency incident business management standards is critical to interagency fire operations. PMS 902 assists NWCG agencies in constructively working together to provide effective execution of each agency's incident business management program.

References:

PMS 902