Skip to main content

Fire Shelter History

October 29, 1804 Journal Entry, William Clark.

“The Prarie was Set on fire (or Cought by accident)… the fire went with Such velocity that it burnt to death a man and woman, who Could not Get to any place of Safty, one man a woman & Child much burnt and Several narrowly escaped the flame — a boy… was Saved un hurt in the midst of the flaim — The Cause of his being Saved was a Green buffalow Skin was thrown over him by his mother… the Fire did not burn under the Skin leaving the grass round the boy.”

Fire Shelter Development

Modern fire shelter development began in Australia in 1958 with work on a bell-shaped shelter made of a laminate of aluminum foil and glass cloth (see Figure 1).

In 1959, the Australians abandoned the bell-shape in favor of an A-frame design. That same year, the Forest Service’s Missoula Equipment Development Center (MEDC) began developing a fire shelter. Over the next few years, MEDC, and the Australians shared ideas and shelters (see Figures 2 and 3).

Man inside of a bell-shaped shelter made of a laminate of aluminum foil and glass cloth in the forest.

Figure 1 Early prototype shelter design.

Main in a testing suit standing before a contained fire in the forest.

Figure 2 Testing suits made of shelter material.

Man in squatting position holding a heatshield between himself and a controlled fire.

Figure 3 Testing radiant heat shields.

 

In 1967, the Forest Service made its first large purchase of 6,000 fire shelters through the General Services Administration (GSA). These shelters were made of an aluminum foil and glass cloth laminate with a kraft paper barrier inner liner. The shelter had an A-frame shape, weighed 4.3 pounds (see Figure 4 and 5), and was accordion folded into a 14- x 6- x 3-inch package . It had an orange case and attached belt for carrying. The kraft paper liner was eliminated in 1974.

Photo of an aluminum foil shelter setup in an open field next to yellow shelter bag and in front of a line of tall trees in the background.

Figure 4 Old-style shelter used until 2010.

Illustration of How the shelter works.

Figure 5 Early graphic of how a shelter worked.

MEDC underwent a name change to the Missoula Technology and Development Center (MTDC) in 1987, and in 2017 the name was changed again to the National Technology and Development Program (NTDP).

The Forest Service made carrying the fire shelter mandatory in 1977 after three firefighters without shelters were killed on the Battlement Creek Fire in Colorado in 1976.

In 1981, toxicity testing was added to the fire shelter specification. Additionally, the shelter was modified to include hold down flaps, the folding method was updated resulting in a package measuring 9 x 5 ¾ x 3 inches, and the case was changed from orange canvas to yellow nylon (see Figure 6 and 7).  In 1989, a hard plastic case liner was added to improve the shelter’s durability.

The old-style shelter was designed to reflect radiant heat and to trap breathable air, not to withstand flame contact, which rapidly damaged the shelter.

The aluminum foil layer reflected radiant heat away from the shelter while the fiberglass backing provided strength and stiffness to the aluminum foil. The adhesive was selected to withstand high temperatures without being toxic.

Old style orange canvas fire shelter.

Figure 6 Old-style shelter orange canvas carry case from 1964-1981. 

Photo of an aluminum foil shelter setup in an open field next to yellow shelter bag and in front of a line of tall trees in the background.

Figure 7 Old-style shelter in yellow nylon carry case from 1981-2010.

Old-style shelter

1964 – 2009

~1,100 deployments

~500 precautionary

300 prevented injury1,2

300 lives saved1

20 fatalities3

Estimated total.

Moderate to severe injury.

Some died after leaving shelter too soon or by not deploying soon enough.

M-2002 shelter

2004 – present

203 deployments4

16 precautionary

114 prevented injury2

61 lives saved

21 fatalities5

Deployment totals through 2022.

Nineteen of those lives were of the Granite Mountain Hotshot Crew in an incident near Yarnell, AZ on June 30, 2013. 

Development of the M-2002 Fire Shelter

Shelter burning during testing.

Figure 6 Old-style shelter showing the adhesive igniting inside the shelter during testing.

MTDC tested fire shelter prototypes and the old-style shelter during the late 1990s. Data was collected and compared for both temperature and heat flux (heat flux is a measure of the rate of energy transfer, usually measured in kilowatts per meter squared (kW/m2­­)). During testing, insulated cameras were placed inside and outside the shelters to better understand and visualize the conditions inside the fire shelter. In 1999, video from inside one of the old-style shelters, viewed in slow motion, showed an ignition inside the fire shelter (see Figure 6).

The Forest Service contracted with the Department of Mechanical Engineering at the University of Alberta (UA) to determine the cause of the ignition. The tests at UA showed that when the shelter cloth was heated to a temperature of 450 to 500 degrees Fahrenheit, the adhesive used to bond the laminate would begin to turn into gas. This gas could pass easily through the fiberglass cloth and collect inside the shelter. If the gas reached a concentration that was high enough and was then heated to ignition temperature, the gasses inside the shelter could ignite. This sequence was most likely to occur if the shelter was exposed to direct flame. The flames inside the shelter raised concerns that they might injure a firefighter, cause a firefighter to panic and abandon their shelter, or lead to more rapid failure of the fire shelter.

In January of 2000, MTDC was directed by Forest Service Fire and Aviation Management (FAM) leadership to pursue the development of a new fire shelter.

The goals of the shelter development project were to:

  • Maintain the same level of protection in radiant heat offered by the old-style shelter
  • Improve protection from direct-flame contact
  • Maintain the requirement that the occupant not be exposed to dangerous toxic compounds from the shelter
  • Provide an acceptably strong and durable shelter
  • Prevent flammable gases from collecting inside the shelter
  • Consider weight, bulk, and cost

The process used to develop the shelter included:

  • Develop lab-based tests
  • Find and/or develop new materials and designs for testing
  • Test the new materials and designs
  • Test the old-style shelter for baseline comparisons
  • Compare the results for the new materials and designs to those for the old-style shelter
  • Offer options to decision-makers for final design selection
Shelter on a trailer connected to a small fuel tank.  Flames bursting from the top.

Figure 7 Full-scale fire shelter testing.

In 2001, testing methods were developed and implemented to evaluate toxicity and thermal performance of shelter prototype materials.  This allowed MTDC to evaluate and compare potential fire shelter materials under repeatable and reliable testing parameters. Later that year, new materials, and material combinations were developed and tested using the new methods.

In February of 2002, ten prototypes of varying weight, bulk, and performance levels, were presented to Interagency Fire Directors. The Fire Directors selected four shelter prototypes for evaluation in the next phase of testing.

The four shelters were subjected to an intensive round of small- and full-scale testing (see Figure 7) and toxicity testing. The results were peer-reviewed and then presented to the Fire Directors on June 2, 2002. The group unanimously selected the M-2002 fire shelter because of its bulk, weight, and level of protection.

2014 Fire Shelter Project Review

The M-2002 shelter underwent a project review beginning in 2014 and concluding in early 2019.

NTDP executed an exhaustive search of materials and designs, working with 23 different entities, from which hundreds of different materials and material combinations were produced.

The fire shelter material search was divided into three categories:

  • Lighter weight and less bulk with similar performance to the current shelter.
  • Similar weight and bulk with improved performance.
  • Heavier weight and bulk with pronounced improved performance.

The U.S. Forest Service entered into a collaborative agreement with the National Aeronautics and Space Administration (NASA) Langley Research Center, located in Hampton, Virginia, to examine potential improvements to fire shelter performance. A team of engineers from NASA was developing flexible heat shields to protect spacecraft from the high temperatures of atmospheric entry under NASA’s Hypersonic Inflatable Aerodynamic Decelerator (HIAD) project. NASA and the U.S. Forest Service found common performance requirements between fire shelters and flexible heat shields that could benefit both organizations. North Carolina State University Wilson College of Textiles received a grant under the Assistance to Firefighters Program of Federal Emergency Management Agency (FEMA) and submitted fire shelter prototypes that were considered by the National Wildfire Coordinating Group (NWCG) Fire Shelter Subcommittee (FSSC). North Carolina State’s shelter submissions closely mirrored the NASA prototypes.

The Fire Shelter and Personal Protective Equipment (PPE) Subcommittee (FSPPES) provides interagency leadership and oversight in all areas of fire shelter and PPE program management. It is comprised of wildland firefighters from federal and state entities that have operational fireline experience. The FSPPES' primary objectives are:
  • Provide input to the National Training and Development Program (NTDP) regarding fire shelter and PPE specifications.
  • Support continuous improvement of fire shelters and PPE programs.
  • Assist with the development of fire shelter and PPE training.
  • Coordinate with NTDP and other pertinent entities to accomplish the subcommittee’s mission.
  • Communicate pertinent fire shelter and PPE information effectively.

The materials and shelter designs were evaluated on weight, bulk, durability, and toxicity – critical factors for suitability for use in fire shelters. Material samples were tested based on three tiers.

  • Tier 1 tests for small-scale thermal and radiant heat exposure.
  • Tier 2 has material toxicity screening and strength testing.
  • Tier 3 performs full-scale shelter tests: convective and radiant exposure, durability, seam strength, elevated seam strength, and peel strength.

Suitable materials were tested in a small-scale flame test to determine material strength, durability, flammability, thermal performance, and off-gassing toxicity (Tier 1 and 2). Materials that showed promise in the small-scale test were then constructed into fire shelters and tested in full-scale, direct-flame tests to measure the performance of the overall fire shelter design (Tier 3). Shelters were subjected to crown fire testing in the Northwest Territories of Canada, as well as lab testing at UA from 2015 through 2017.

After hundreds of full-scale lab tests, four prototype designs were selected for wear testing by firefighters during the 2018 fire season. A total of 60 prototype shelters were produced for wear testing to expose any unforeseen issues with production, packaging, material/component wear, and durability.

A smaller, lighter prototype performed better than the current shelter, but did not satisfactorily endure production rigors and was eliminated from consideration. A second prototype for line-going firefighters was carried by 20 Interagency Hotshot Crew members for wear testing. Finally, two larger, bulkier shelters were carried by engine and equipment operators only. Two of the shelters tested were designed by NASA as part of the NASA and United States Forest Service (USFS) cooperative agreement for this project.

The prototype designed for line-going firefighters showed a 37-second direct-flame test performance improvement, however, it is nearly one pound heavier and has 1.7 times more volume than the current shelter (see Figure 8). The prototype designed for equipment operators showed a 52-second direct-flame test performance increase, however, it was more than four times the volume, and nearly 1½ pounds heavier (see Figure 9).

Two shelter carriers side-by-side, one green, the other blue.

Figure 8 Left image is of the prototype carried by firefighters during the 2019 wear trial. The right is the current shelter.

Three shelter carriers side-by-side, one yellow, one blue, the other green.

Figure 9 Fire shelters carried during the 2019 field wear trial. The left shelter was for equipment and engine operators and the right shelter was carried by firefighters. The current shelter (middle) shows the difference in size of the prototypes.

The FSSC weighed many facets of the fire shelter but emphasized the following:

  • Physiological stress from additional weight.
  • Limited storage space in firefighters’ packs.
  • Limited incremental increase in protection.
  • Firefighter survey responses indicating a desire for a lighter weight/less bulky shelter, and.
  • Decreasing trend in annual fire shelter deployments.

The five-year study concluded that the current fire shelter model continues to provide the most practical amount of protection given tradeoffs of weight, volume (bulk), durability, and material toxicity. The study resulted in modifications to the shelter including:

1) An updated pattern design to use material more efficiently.

2) A new adhesive formula that withstands higher temperatures before degradation occurs and is less soluble in water.

3) Changes to the fire shelter’s polyvinyl chloride (PVC) bag to ensure a more reliable opening.

 
 

NWCG Latest Announcements

The Incident Position Standards and Next Generation Position Task Book are now available for Equipment Time Recorder (EQTR)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51 and NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51 are now available.

The Performance Support Package, which for EQTR, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Equipment Time Recorder Position Page

NWCG Incident Position Standards for Equipment Time Recorder, PMS 350-51

NWCG Position Task Book for Equipment Time Recorder (EQTR), PMS 311-51

The Incident Position Standards and Next Generation Position Task Book are now available for Personnel Time Recorder (PTRC)

Date: November 13, 2024
Contact: Incident Business Committee

NWCG is excited to announce that the NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53 and NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53 are now available.

The Performance Support Package, which for PTRC, includes the Incident Position Standards and Next Generation Position Task Book were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Personnel Time Recorder Position Page

NWCG Incident Position Standards for Personnel Time Recorder, PMS 350-53

NWCG Position Task Book for Personnel Time Recorder (PTRC), PMS 311-53

NWCG Risk Management Committee Releases Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

Date: November 7, 2024
Contact: Risk Management Committee

The Risk Management Committee (RMC) has released Safety Bulletin: 24-001 Use of Respirators on Wildland Fires. As wildland fire respirators are available through several established vendors, wildland fire personnel need to understand regulations and limitations of respirator use in the workplace.

Safety Bulletin 24-001 outlines the following topics regarding respirator use for wildland fires:

  • Requirements for Respirator Use
  • Voluntary Respirator Use
  • Current Respirator Options
  • Unknown Risks of Respirator Use

This bulletin also provides mitigation recommendations to help reduce smoke exposure for wildland firefighting efforts.

References:

NWCG Safety Bulletin: 24-001 Use of Respirators on Wildland Fires

NWCG Smoke Management Guide for Prescribed Fire, PMS 420-3

VIDEO: Protecting Wildfire Personnel from Smoke - How Incident Management Teams Address Smokes Risks

VIDEO: Smoke, Knowing the Risks

The Incident Position Standards and Next Generation Position Task Book are now available for Medical Unit Leader (MEDL)

Date: October 16, 2024
Contact: Incident Medical Subcommittee

NWCG is excited to announce that the NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39 and NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39 are now available.

The Performance Support Package, which for MEDL includes the Incident Position Standards and Next Generation Position Task Book, were developed through the Incident Performance and Training Modernization (IPTM) effort. The Performance Support Package will support trainees, those qualified in the position, and evaluators.

References:

NWCG Medical Unit Leader Position Page

NWCG Incident Position Standards for Medical Unit Leader, PMS 350-39

NWCG Position Task Book for Medical Unit Leader (MEDL), PMS 311-39