Skip to main content

Planning Section Chief Type 3*

PSC3 decorative banner: photos depicting PSC3 position.

The Planning Section Chief Type 3 (PSC3) manages all aspects of incident planning, situation and resource status, and demobilization of an incident. The PSC3 supervises members of the Planning section and may perform all functions of various positions in that section dependent upon incident complexity and assigned resources. The PSC3 is part of the Command and General (C&G) and reports to the Incident Commander (IC) under typical incident organizations. The PSC3 works in the Planning functional area.

The PSC3 performs position duties commensurate with Type 3 incident complexity and characteristics stated in the Interagency Standards for Fire and Fire Aviation Operations (Red Book). (Type 1, 2 and 3 PSC duties are identical but performed at different complexity levels.)

USWDS Paragraphs

The Forest Service and Department of Interior are enabled by Administratively Determined Pay Plans (AD Pay Plans) to hire persons for temporary duration for the following reasons:

  1. To cope with a sudden and unexpected emergency caused by a fire, or extreme fire potential, flood, storm, or any other all-hazard emergency that threatens damage to federally protected property, has the potential to cause loss of life, serious injury, public health risk, or damage to natural or cultural resources unless brought under immediate control.
  2. To provide emergency assistance to States under formalized agreements.
  3. To meet mission assignments issued by the Federal Emergency Management Agency (FEMA).

The National Wildfire Coordinating Group (NWCG) Incident Business Committee (IBC) reviews positions annually and establishes pay rate classifications for each position.

For more information on the AD Pay Plans, visit Incident Business Committee.

Date: Jan 2023

Added: 

  • Planning Section Chief Complex (PSCC) to "These Positions Maintain Currency For PSC3."
  • Planning Section Chief Complex (PSCC) to "PSC3 Maintains Currency For These Positions."
Date: Dec 2020

Added: Incident Position Description (IPD) approved.

Date: Oct 2019

Added: Qualification Requirements:  Note: Once qualified as SITL, RESL, or ICT3, the PSC3 qualification may be granted by the certifying official. Certification must be documented on a “verification/certification” page of the PSC3 Position Task Book (PMS 311-55).

Date: Oct 2018

Added: Type 3 All-Hazard Incident Management Team (O-305) to Other Training Which Supports Development of Knowledge and Skills.

Date: Oct 2016

Added: Introduction to ICS (ICS-100) and NIMS: An Introduction (IS-700) to Required Training.

Date: Oct 2015

Updated:  footnote language:

The Planning Section Chief Type 3 (PSC3) position is also utilized in the DOI All Hazard Qualification System. The FEMA All Hazard Planning Section Chief PTB is appropriate for use with this position and is available on the NWCG website.

Date: Oct 2014

Position created.

Type 3 Position standards are being introduced to provide an agreed to minimum standard for National Mobilization and to help develop local capability.  Currently the PSC3, LSC3, and FSC3 positions are utilized by FEMA and the Department of the Interior All Hazard qualification program.

NWCG recognizes the ability of cooperating agencies at the local level to jointly define and accept each other’s qualifications for initial attack, extended attack, large fire operations, and prescribed fire.

Position qualification pathways for the LSC3PSC3, and FSC3 positions include both equivalency and position task book alternatives for position qualification.   FEMA position task books will be utilized for these positions and are available at training.fema.gov/position%20specific%20taskbooks/taskbook_list.asp.

USWDS Paragraph Bundles



Last Modified / Reviewed:

Please Provide Feedback

NWCG values your constructive input and we thank you for taking the time to provide feedback.

Although contact information is optional, we hope that you provide a way for us to contact you in case we need clarification on your comment. If you would like to be contacted regarding your feedback, you must provide contact information. 

Would you like a response?
If you would like a response, you must provide contact information (name and email) below.
One file only.
9.28 GB limit.
Allowed types: gif, jpg, jpeg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, mp4, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip.

NWCG Latest Announcements

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505

New Job Aids Available: Packing Lists for Wildland Fire Fireline Personnel and Support Staff, J-101 and J-102

Date: December 3, 2024
Contact: NWCG TRAINING

Two new job aids are now available: Packing List for Wildland Fire Fireline Personnel, J-101 and Packing List for Wildland Fire Support Personnel, J-102, should serve as a baseline for items needed on a wildland fire assignment. These lists will help personnel prepare for a 14 to 21-day assignment on the fireline or in a support role.

References:

Job Aid Catalog

NWCG Packing List for Wildland Fire Fireline Personnel, J-101

NWCG Packing List for Wildland Fire Support Staff, J-102

NWCG Equipment Technology Committee Releases Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Date: November 14, 2024
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention. Misaligned toolless fuel caps on Stihl chainsaws have led to recurring fuel spillage, fuel ignition, and burn injuries during wildland fire management operations.

This Safety Warning is intended to highlight the details and recommended procedures for the installation of a Stihl chainsaw toolless fuel cap, as well as how to identify and correct a misaligned, damaged, or broken fuel cap to help prevent fuel spillage.

References:

NWCG Safety Warning: 24-001 Stihl Chainsaw Toolless Fuel Cap Spill Prevention

Advertencia de equipos 24-001: Prevención de derrames de la tapa de combustible sin herramientas de la motosierra Stihl

NWCG Alerts