Skip to main content

PMS 530-1

Personnel, Government

Helicopter Operations Risk Assessments

Aircraft | Facilities | Operations | Personnel Contractors | Personnel Government | Technology


SYSTEM:  Helicopter Operations, Personnel (Government)

Sub-System Hazards Pre-Mitigation Mitigation Post-Mitigation

Probability

Severity

Risk Level

Probability

Severity

Risk Level

Policy Operational and mission goals during all-hazard assignments may be unstated or unclear and may conflict with interagency standards and policy

Likely

Critical

Extremely High

Adequate in-brief and dissemination of Commander's intent. Clarification of scope of authority and policy in place.  Adhere to interagency policy, procedures and guidelines (e.g., NSHO). If unable to perform duties utilizing interagency policy, perform a separate risk assessment with appropriate approval sign off. Ensure personnel are working within the scope of their employment. Implementation of Aviation Doctrine may further mitigate conflicts between direction and policy.

Possible

Critical

High

Training Unable to bring seasonals on early enough to provide all the required training prior to sending on incidents

Almost Certain

Critical

Extremely High

Ensure line officers are committed to providing adequate time and funding to develop personnel as necessary.

Possible

Critical

High

Lack of Crew Resource Management (CRM)

Likely

Critical

Extremely High

Provide adequate time for training and provide time for Modules to develop CRM prior to field season.  Provide training in CRM for Modules annually. Brief/debrief, maintain positive attitude.

Possible

Critical

High

Human Factors Fatigue/burnout due to incident duration as well as year-round All Risk incident support

Likely

Critical

Extremely High

Adhere to work/rest guidelines. Monitor fatigue levels of crews. Rotate personnel and helicopter programs to manage fatigue and burnout. Manage number and duration of assignments. Ensure adequate time off and provide quality R and R while on assignments.

Possible

Critical

High

Acceptance of high-risk missions as normal

Likely

Catastrophic

Extremely High

Review risk assessment and existing policy/procedures, brief/debrief with all personnel and utilize risk management tools to include Go-No-Go Checklists. Educate personnel on the hazards of normalization of risk and complacency. Mission decision made at appropriate level. Must have better communication and collaboration between Operations and Aviation.

Unlikely

Catastrophic

High

High workload for Maintenance Inspectors may compromise their ability to perform thorough inspections.  Standard inspections criteria not followed consistently among agencies or regions

Likely

Critical

Extremely High

Increase amount of personnel available to perform the duties of Maintenance Inspector in proportion with span of control. Ensure inspection standards are developed and maintained by agencies.

Unlikely

Critical

Medium

Conflicting personalities resulting in hazardous attitudes

Possible

Critical

High

If individuals cannot professionally resolve differences, managers and supervisors must intervene immediately. Brief/debrief, employ CRM, provide honest and objective feedback, maintain positive attitude. Maintain professionalism and mission focus at all times.

Unlikely

Critical

Medium

 

Download the Word version (docx) of this information and the Risk Assessment Matrix (pdf) to use with the Risk Assessment Worksheet (docx).

 

 

Modified / Reviewed:

NWCG Latest Announcements

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page