Skip to main content

PMS 936 Symbology Secondary Symbols

View the symbology page for more information.

Symbology: Point | Line | Polygon | Secondary Symbols


Symbol Symbol Name Sort descending Category Link to NWCG Glossary (if one exists)
Six green oblong dots. Completed - Inspected Line Repair Status
Solid green square. Completed - Inspection Point Repair Status
Solid yellow circle. Completed - Ready for Inspection Point Repair Status
Solid orange line with rounded ends. In Progress Line Repair Status
Point Repair Status In Progress Point Repair Status
Solid pink line with rounded ends. In Use - Fire Management Line Repair Status
Circle pink line. In Use - Fire Management Point Repair Status
Solid red-orange line. Limited Action Line Strategic Operations
Solid purple line with rounded ends. Needs Assessment Line Repair Status
Solid purple circle Needs Assessment Point Repair Status
No Repair Needed Point Repair Status
Solid gray line with rounded ends. Other - See Comments Line Repair Status
Solid gray circle. Other - See Comments Point Repair Status
Solid blue line. Primary Strategic Line Strategic Operations
Solid yellow-green line. Proposed Strategic Line Strategic Operations
Solid red circle. Repair Needed Point Repair Status
Solid red line with rounded ends. Repair Needed Line Repair Status
Solid blue-green line. Secondary Strategic Line Strategic Operations
Showing 1 - 18 of 18 entries

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514