Skip to main content

PMS 936-1

Review and Export Layout

Refer to the Map Elements page of GeoOps and review your layout to ensure that all required elements (STANDL SGD) are present and correct.

Export the layout from the Share tab on the ribbon > Export Layout button. Export settings may vary depending on the plotter and driver used. Ensure export of georeference information and font embedding are good practice.

Review the exported layout to ensure it appears as intended, i.e., all fonts display correctly, assignment breaks and labels appear, labels do not overlap, there are no data selections in the map, etc.

If needed, reduce or optimize the size of the exported PDF. This can be done in Adobe Acrobat Pro, Foxit PDF, or with several free online tools. The smaller the file size of the PDF, the faster uploads to and downloads from FTP and/or SharePoint will be for both GISS and firefighters using the products in the Avenza Maps application.

Additional Considerations for Digital-Only Geospatial PDFs

All PDFs exported from ArcGIS are geo-enabled (unless default settings have been modified) and can be used in any software that works with 'GeoPDFs.'

However, creating a Geospatial PDF designed specifically for digital use in an application like Avenza Maps follows a different workflow than creating a traditional paper map since it is not constrained by paper sizes. The Geospatial PDF should be designed with the user's area of interest and map scale in mind first with the "page" size determined second.

Operational needs will dictate the type of Geospatial PDF to be created. Once that determination is made, decide on the base map that best suits that type of map. For example, an IAP map will require topography, while transportation will need a roads layer. Aerial imagery can also be very beneficial for some maps. In some cases, the background on the topographic map can be made transparent and the topo can be displayed on top of aerial imagery.

The appropriate map scale for use on a mobile device also needs to be determined. Typical topo maps should be at 1:24k; aerial imagery may be 1:8k-12k; and a travel map may be 1:50k-100k.

Focus on the map scale the end-user needs to do their job. Since a PDF is a single static image, not a tile cache like a web map, there will be no additional information when a user "zooms in," only what's already there but bigger. This is why the scale is important, if the features, and labels are all sized for 8k, but the map needs to be used at 24k, everything will be far too small.

The last consideration is the “page size.” Since the map is designed for digital use only and not being printed, it does not need to adhere to a standard size. Rather than the paper size, the “page size” is determined by the area of interest and ArcMap/Pro allows you to set a custom page size to cover the area that you need. There is a trade-off between page size, scale, and output file size, so be sure to keep that in mind during this process. The PDF file should be compressed/optimized for easier distribution before being loaded onto devices for use on the fireline.

The map must still have all the standard map elements (STANDL SGD), however, a few modifications are useful. The title, legend, etc. need to be legible, but they don’t have to be large enough to read at a 1:1 scale. Additionally, the amount of white space around the borders can be minimized since there is no risk of a printer cutting it off.

After exporting a map designed primarily for digital consumption, it’s best practice to test the map in the application in which it will be used.

Job Aids

 

Page Last Modified / Reviewed:

NWCG Latest Announcements

Updated NWCG Standards for Course Delivery, PMS 901-1 and NWCG Training Course Completion Certificate, PMS 921-1

Date: July 17, 2024
Contact: Training Delivery Committee 

The Training Delivery Committee (TDC) has updated the NWCG Standards for Course Delivery, PMS 901-1 to reflect changes in the standards for course management and delivery. These changes have been reviewed and approved by the members of TDC over the past year. Significant updates include additional delivery methods, updated definitions, and instructions for the use of digital signatures on training certificates. The NWCG Training Course Completion Certificate, PMS 921-1 has been updated to lock after an electronic signature has been applied.

References:

NWCG Standards for Course Delivery, PMS 901-1

NWCG Training Course Completion Certificate, PMS 921-1

IBC Memo 24-01: OF 297 Signature Order and 2024 Fire Season Use IBC Memo 24-02: Summary of Changes for SIIBM, PMS 902

Date: July 15, 2024
Contact: Incident Business Committee 

The NWCG Incident Business Committee (IBC) has recently released two memorandums. The first provides direction on the use of the Emergency Equipment Shift Ticket, OF 297 for the 2024 fire season. Due to delays in hard copy printing, both the 2024 revision and the older version of the Emergency Equipment Shift Ticket, OF 297 are acceptable for use during the 2024 fire season.

The second memorandum documents the updates of the newly revised NWCG Standards for Interagency Incident Business Management (SIIBM), PMS 902. The summary of changes attached to the memo covers the major updates and process changes from the 2022 version.

References:

IBC Memorandum 24-01: OF 297 Signature Order and 2024 Fire Season Use

IBC Memorandum 24-02: Summary of Changes for the NWCG Standards of Interagency Incident Business Management, PMS 902

IBC Memorandum 24-02 Attachment: Summary of Changes

NWCG Standards for Rapid Extraction Module Support, PMS 552

Date: July 10, 2024
Contact: Incident Medical Unit Subcommittee 

A new publication from the Incident Medical Unit Subcommittee is now available. The NWCG Standards for Rapid Extraction Module Support, PMS 552 will be used as a guide and as an opportunity to begin to build out Rapid Extraction Module Support (REMS) modules for the remainder of Fire Year 2024. These standards will be fully implemented as the minimum standard starting in January 2025.

NWCG Standards for Rapid Extraction Module Support outlines the roles, duties, qualifications, and equipment pertinent to REMS. A REMS team, strategically stationed at wildland fires, plays a pivotal role in prioritizing swift access and medical treatment to injured or ill firefighters for safe and efficient egress off the fireline. This ensures their rapid transport to definitive medical care in cases of emergency during firefighting operations, highlighting the invaluable contribution of the REMS team to firefighter safety and well-being.

References:

NWCG Standards for Rapid Extraction Module Support, PMS 552

National Wildland Firefighter Day

Date: July 2, 2024
Contact: National Interagency Fire Center 

The National Wildfire Coordinating Group (NWCG) would like to recognize July 2, 2024, as National Wildland Firefighter Day (NWFFD). Established in 2022, NWFFD honors the dedication of wildland firefighters and support personnel. This day falls within the 2024 Week of Remembrance (June 30 - July 6), providing an opportunity to renew our commitment to wildland firefighter safety while remembering those who have fallen in the line of duty.

NWCG continues to provide leadership to enable interoperable wildland fire operations among federal, state, local, Tribal, and territorial partners. NWCG standards and training establish common practices to contribute to safe, effective, and coordinated national interagency wildland fire operations.

References:

NWCG.gov

Week of Remembrance

National Wildland Firefighter Day