Update the Master Incident GDB

Overview of Implementing the Master Incident GDB

The Master Incident GDB is the File GDB used for all incident map creation stored in the \incident_data folder. It is simply a copy of the Offline Copy created after edits are complete.  The Master Incident GDB does not exist as a blank GDB like the annotation and progression GDBs. It must be created for the first time, and then replaced each time edits are made to the Offline Copy that will need to be reflected in printed maps. The Master Incident GDB contains “Event” in the standard file name as it is the implementation of the Event schema.

NOTE: Never edit the Master Incident GDB. All data edits should be completed in the Offline Copy in the Edit Project.

The Offline Copy will be a Mobile Geodatabase. This format should be converted to File Geodatabase for full functionality.

GISS Workflow Diagram: Update the Master Incident GDB

Update the Master Incident GDB – Done After Every Edit Cycle

  1. Back up Offline Copy
    1. Determine the path and name of the Offline Copy.
    2. Convert the Offline Copy (mobile GDB) to a backup GDB (file GDB).  Save into the daily backup folder under incident_data\backups and name following GeoOps.
  2. Create or Replace Master Incident GDB
    1. If the Master Incident GDB already exists, delete from \incident_data.
    2. Copy the backup to the \incident_data folder and rename it following GeoOps to become the new Master Incident GDB.
Image

Figure 1. GISS Workflow Diagram: Update the Master Incident GDB
(click image to enlarge)

 

Job Aids

 

NWCG Latest Announcements

WFSTAR 2025 Core Component Module Package and 2024 Fire Year in Review Now Available

Date: March 14, 2025
Questions?  Please contact:
Joe Schindel at mschindel@blm.gov
 

The 2025 Core Component Module Package for RT-130, Wildland Fire Safety Training Annual Refresher (WFSTAR) and the 2024 Fire Year in Review are now available on the NWCG website. The 2025 Core Component Module Package provides all content needed to deliver RT-130.

References:

2025 Core Component Module Package

2024 Fire Year in Review Module

NEW! NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053

Date: March 12, 2025
Contact: Wildland Urban Interface Mitigation Committee

The NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 provides mitigation practitioners at all experience levels with recommendations on the most effective and efficient ways to accomplish mitigation work in communities at risk to wildfire damage or destruction. The content in this guide was written in coordination with the NWCG Standards for Mitigation in the Wildland Urban Interface, PMS 052.

References:

NWCG Wildland Urban Interface Mitigation Field Guide, PMS 053 

Updated, NWCG Standards for Wildland Fire Module Operations, PMS 430

Date: March 11, 2025
Contact: Fire Use Subcommittee
Wildland Fire Module Unit

The NWCG Standards for Wildland Fire Module Operations, PMS 430 standardizes procedures and expectations for Wildland Fire Modules (WFMs). These standards are to be used by staff, supervisors, specialists, and technicians for planning, administering, and conducting WFM operations. These standards will also be used as a measure of WFM qualifications, capabilities, and expected performance, for both Type 1 and Type 2 WFMs.

References:

NWCG Standards for Wildland Fire Module Operations, PMS 430

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514