Skip to main content

Configure the ArcGIS Pro Project Template


Configuring the ArcGIS Pro Project Template will streamline data edits and map creation and provide a solid foundation for the duration of an incident.

Note: It is very important to begin with a new zip of the Current_GeoOps_Folder_Structure when setting up a project. This will allow the Pro Project Template to establish the correct file pathways. Reusing the folder structure or the Pro Project Template is not recommended.
  1. In the \projects folder, open the 2024_ProProjectTemplate APRX file.
  2. A display issue affects the Home Folder name in some versions of Pro. In the Project Folders under Contents, rename the Home Folder after confirming the underlying connection is correct.
    Image
    Catalog window is open. Path C:\2023_Incidents\2023_Demo is circled in red.
  3. In the Project Databases folder under Contents, rename the Default GDB (other_incident_data GDB) with the incident name and Unique Fire ID.
    Image
    Note: A slow double-click on the database name in the Catalog View must be used to update the name. The Rename button will be grayed out. Be sure to rename the Default GDB prior to opening the provided Map View or a database lock will be created, and you will be unable to rename the Default GDB.
  4. Rename the Annotation and Progression GDBs.
    Image
  5. Navigate to the Project Maps folder. Open the provided map view {MapType}_2024_{IncidentName}.
    1. Add the Incident Name to the map title, but leave {MapType}.
    2. Repair the path of the DynamicTextUpdate table to the existing table in the Default GDB (other_incident_data.gdb).
      Image
    3. Set the coordinate system of the map to a local projected coordinate system.
      Image
    Note: By setting the coordinate system now, all incident projects will inherit this configuration. If you do not wish to use the same coordinate system for all incident projects, this can be set after each Save-As of the ProProjectTemplate APRX.
  6. Save the Project.

 

Modified / Reviewed:

NWCG Latest Announcements

NEW! NWCG Standards for Airtanker Operations, PMS 514

Date: March 7, 2025
Contact: National Interagency Aviation Committee

The NWCG Standards for Airtanker Operations, PMS 514 establishes the standards for dispatching, utilizing, and coordinating airtankers on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, NWCG Standards for Airtanker Base Operations (SABO), PMS 508, and any applicable agency plans.

References:

NWCG Standards for Airtanker Operations, PMS 514

Incident Position Standards and Next Gen Position Task Books Now Available for Dispatch Incident Positions

Date: March 5, 2025
Contact: National Coordination System Committee

NWCG is excited to announce that Incident Position Standards and Next Generation Position Task Books are now available for all six Dispatch positions:

  • Aircraft Dispatcher
  • Expanded Dispatch Coordinator
  • Expanded Dispatch Recorder
  • Expanded Dispatch Supervisory Dispatcher
  • Expanded Dispatch Support Dispatcher
  • Initial Attack Dispatcher

The Performance Support Packages for these positions, including the Expanded Dispatch Job Aid, J-601 and the Initial Attack and Aircraft Dispatcher Job Aid, J-602, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Aircraft Dispatcher Position Page 

NWCG Expanded Dispatch Coordinator Position Page 

NWCG Expanded Dispatch Recorder Position Page 

NWCG Expanded Dispatch Supervisory Dispatcher Position Page 

NWCG Expanded Dispatch Support Dispatcher Position Page 

NWCG Initial Attack Dispatcher Position Page 

NWCG Job Aids 

Incident Position Standards and the Next Generation Position Task Books Now Available for DMOB, DOCL, and RESL

Date: February 28, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Books are now available for Demobilization Unit Leader (DMOB), Documentation Unit Leader (DOCL), and Resources Unit Leader (RESL).

The Performance Support Packages for these positions, including a job aid for RESL, were developed as part of the Incident Performance and Training Modernization (IPTM) effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1.

References:

NWCG Demobilization Unit Leader Position Page 

NWCG Documentation Unit Leader Position Page 

NWCG Resources Unit Leader Position Page 

Next Generation Position Task Book and Updated Incident Position Description Now Available for Operations Section Chief Complex

Date: February 27, 2025
Contact: Incident Operations Subcommittee

NWCG is excited to announce that Operations Section Chief Complex (OSCC) has a Next Generation NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108 and an updated Incident Position Description.

These resources support trainees, qualified personnel, and evaluators in their respective roles.

References:

NWCG Operations Section Chief Complex Position Page 

NWCG Operations Section Chief Complex Incident Position Description 

NWCG Position Task Book for Operations Section Chief Complex (OSCC), PMS 311-108