Skip to main content

Configure the ArcGIS Pro Project Template


Configuring the ArcGIS Pro Project Template will streamline data edits and map creation and provide a solid foundation for the duration of an incident.

Note: It is very important to begin with a new zip of the Current_GeoOps_Folder_Structure when setting up a project. This will allow the Pro Project Template to establish the correct file pathways. Reusing the folder structure or the Pro Project Template is not recommended.
  1. In the \projects folder, open the 2024_ProProjectTemplate APRX file.
  2. A display issue affects the Home Folder name in some versions of Pro. In the Project Folders under Contents, rename the Home Folder after confirming the underlying connection is correct.
    Image
    Catalog window is open. Path C:\2023_Incidents\2023_Demo is circled in red.
  3. In the Project Databases folder under Contents, rename the Default GDB (other_incident_data GDB) with the incident name and Unique Fire ID.
    Image
    Note: A slow double-click on the database name in the Catalog View must be used to update the name. The Rename button will be grayed out. Be sure to rename the Default GDB prior to opening the provided Map View or a database lock will be created, and you will be unable to rename the Default GDB.
  4. Rename the Annotation and Progression GDBs.
    Image
  5. Navigate to the Project Maps folder. Open the provided map view {MapType}_2024_{IncidentName}.
    1. Add the Incident Name to the map title, but leave {MapType}.
    2. Repair the path of the DynamicTextUpdate table to the existing table in the Default GDB (other_incident_data.gdb).
      Image
    3. Set the coordinate system of the map to a local projected coordinate system.
      Image
    Note: By setting the coordinate system now, all incident projects will inherit this configuration. If you do not wish to use the same coordinate system for all incident projects, this can be set after each Save-As of the ProProjectTemplate APRX.
  6. Save the Project.

 

Modified / Reviewed:

NWCG Latest Announcements

NWCG Equipment Technology Committee Releases Safety Warning: 25-001 Non-specification fire shelters

Date: January 15, 2025
Contact: Equipment Technology Committee

The Equipment Technology Committee (ETC) has released Safety Warning: 25-001 Non-specification fire shelters. Non-specification fire shelters claiming to meet Forest Service (FS) fire shelter specification 5100-606 were first found in February of 2023. As of September 2024, non-specification shelters are again being advertised and sold on the open market.

This Safety Warning outlines details and recommended procedures to purchase FS specification shelters made with materials and components that meet performance criteria and toxicity testing requirements outlined in FS Specification 5100-606. 

For additional information on identifying non-specification shelters, please view ETC Safety Warning 23-01.

References:

ETC Safety Warning 25-001: Non-specification fire shelters

NWCG Equipment Technology Committee

ETC Safety Warning 23-01

Paul Gleason Lead by Example Awards

Date: January 14, 2025
Contact: Leadership Committee

The NWCG Leadership Committee has awarded the 2023 Paul Gleason “Lead By Example” awards to individuals in the categories of Initiative and Innovation, Mentoring and Teamwork, and Motivation and Vision, as well as a Lifetime Achievement Award.

Congratulations to the awardees:

  • Sam Bowen, Superintendent of the Mark Twain Veteran Crew with the U.S. Forest Service.
  • Greg Titus, Zone Fire Management Officer for the St. Marks National Wildlife Refuge with U.S. Fish and Wildlife Service.
  • Renae Crippen, Manager of the Blue Mountain Interagency Dispatch Center with the U.S. Forest Service.
  • Eric Carlson, Instructor with OMNA International.

References:

Paul Gleason Lead by Example Award

Wildland Fire Leadership Development Program

Interview with Paul Gleason

Updated NWCG Standards for Water Scooping Operations, PMS 518

Date: December 19, 2024
Contact: Water Scooper Operations Unit

The NWCG Standards for Water Scooping Operations, PMS 518 establishes the standards for dispatching, utilizing, and coordinating water scooping aircraft on interagency wildland fires. These standards should be used in conjunction with the NWCG Standards for Aerial Supervision (SAS), PMS 505, and any local, state, or geographic/regional water scooping plans.

References:

NWCG Standards for Water Scooping Operations, PMS 518

Updated NWCG Standards for Aerial Supervision, PMS 505

Date: December 19, 2024
Contact: Interagency Aerial Supervision Subcommittee

The Interagency Aerial Supervision Subcommittee has updated the NWCG Standards for Aerial Supervision, PMS 505. PMS 505 establishes standards for aerial supervision operations for national interagency wildland fire operations. 

References:

NWCG Standards for Aerial Supervision, PMS 505